                          PUBLIC CHAPTER NO. 490

                                                   HOUSE BILL NO. 542

                                By Representatives Vaughan, Hardaway, Todd

                                       Substituted for: Senate Bill No. 1139

                                             By Senators Taylor, Stevens

          AN ACT to amend Tennessee Code Annotated, Title 7; Title 13, Chapter 7; Title 65 and
Title 68, relative to utilities.

BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE:

          SECTION 1. Tennessee Code Annotated, Title 7, Chapter 51, is amended by adding the
following as a new part:

          7-51-2601. Part definitions.

                    As used in this part:

                              (1) "Approved contractor" means a contractor that:

                                        (A) Is an appropriately licensed contractor in the state, with
                              demonstrated experience in the construction or installation of the utility
                              infrastructure that will be constructed or installed;

                                         (8) Agrees to comply with the utility's standard work rules and
                              operational standards that apply to contractors that perform work for the
                              utility;

                                         (C) Provides an agreement from the customer to convey utility
                               infrastructure installed pursuant to this part to the utility at no cost to the
                               utility and free and clear of all liens, claims, and encumbrances;

                                         (D) Provides a performance bond, warranties, and other
                               assurances of performance that the utility requires of contractors that
                               perform work for the utility;

                                         (E) Has liability insurance with limits of liability and other terms of
                               coverage that the utility requires of contractors that perform work for the
                               utility;

                                         (F) Provides indemnification to the utility on terms that the utility
                               requires of contractors that perform work for the utility; and

                                         (G) Is a current contractor for the utility that is in. good standing, is
                               listed on a utility's list of contractors that are approved for the construction
                               or installation of utility infrastructure, or is otherwise approved by the utility
                               in writing for construction or installation of the proposed utility
                               infrastructure;

                               (2) "Customer", in the case of a cooperative, means a member of the
                     cooperative and, in the case of any other utility, means a customer of the utility;

                               {3) ''Third-party plans examiner" means an engineer who:

                                         (A) Is registered as a professional engineer in accordance with
                               title 62, chapter 2, with expertise in the design and construction of the
                               utility infrastructure that will be constructed or installed; and
HB542

                                        (B) Has appropriate liability insurance with limits of liability and
                              other terms of coverage that the utility requires of its own third-party
                              engineers;

                              (4) "Utility" means:

                                        (A) An entity subject to the jurisdiction of the Tennessee board of
                              utility regulation in accordance with§ 7-82-701;

                                        (B) A cooperative, as defined in § 65-25-102; or

                                        (C) A county-owned, metropolitan government-owned, or
                              municipal-owned utility that provides water, wastewater, electric, natural
                              gas, or stormwater management and drainage to the public; and

                              (5) "Utility infrastructure" means the water, wastewater, electric, natural
                    gas, or storm water management and drainage facilities, as applicable, that are
                    included in the proposed construction or installation plan and are necessary to
                    provide the applicable utility service or services to customers within the proposed
                    plan of development.

           7-51-2602. Installation of utility infrastructure by private contractors.

                    (a) A utility in this state shall allow a customer of the utility or person submitting a
          plan of development to the utility the option to use an approved contractor or approved
          contractors of the customer's choosing for the installation of such utility infrastructure.
           Utilities shall produce a publicly available list of approved contractors and the process for
           becoming an approved contractor.

                     (b) If a customer or customer representative engages an approved contractor
           pursuant to subsection (a), then, prior to the commencement of work, the customer or
           customer representative shall provide:

                               (1) The name, intended address, and local jurisdiction of the planned
                     development;

                               (2) The approved contractor's name;

                               (3) Evidence of the contractor's eligibility to operate as an approved
                     contractor in accordance with the requirements under§ 7-51-2601 (1); and

                               (4) Other information as the utility may reasonably require.

                     (c) No later than ten (10) business days after submission of the documents
           required under subsection (b), the utility shall:

                               (1) Confirm the contractor's status as an approved contractor and allow
                     the contractor to proceed as an approved contractor in accordance with the
                     requirements for an approved contractor under this part, if the customer or
                     customer representative complies with the requirements of subsection (b);

                               (2) Provide to the customer, or the customer's representative, a report of
                     deficiencies; or

                               (3) Request additional information necessary to determine the eligibility of
                     the contractor's status as an approved contractor.

                     (d) If ten (10) business days pass and the utility fails to take an action as required
           by subsection (c), then the contractor may proceed as an approved contractor and shall
           comply with the requirements for an approved contractor under this part.

                     (e) The utility shall perform inspections of the installation and construction of the
           utility infrastructure installed by the approved contractor in the development, and the
           utility may also inspect materials and test the utility infrastructure as part of such
           inspections. The approved contractor is responsible for correcting any deficiencies

                                                                 2
HB542

          associated with its installation or construction, and the utility is not required to accept or
          commission the utility infrastructure until it determines that the installation and
          construction complies with all applicable requirements under this part. The utility may
          charge a reasonable fee for such inspections and testing in accordance with a schedule
          of fees or charges adopted by the utility and made publicly available.

                    (f) Notwithstanding subsection (a), a utility may require the direct installation or
          construction of specific utility infrastructure by the utility or by an approved contractor
          under the direct supervision of the utility where the requirement is necessary to ensure
          public safety or service reliability of the utility.

          7-51-2603. Utility infrastructure specifications.

                    (a) A utility may provide reasonable construction and manufacturer's
          specifications for utility infrastructure to ensure that the infrastructure is constructed
          properly and with appropriate materials. A utility that chooses to provide such
          specifications shall provide persons with a schedule of all approved materials for utility
          infrastructure with specifications for such materials.

                    (b) Notwithstanding subsection (a), a utility shall not require that materials or
          services for the construction of the utility infrastructure be provided by a specific vendor
          or manufacturer unless using the materials or services by a specific vendor or
          manufacturer is deemed necessary by the utility for the quality and integrity of the utility's
          system.

           7-51-2604. Utility infrastructure plans and designs.

                     (a) Where a utility does not customarily prepare plans and designs for utility
           infrastructure within a plan of development and requires a customer or customer
           representative to prepare and submit such plans and designs, the utility shall:

                               (1) Not charge a fee of more than the fee established in a schedule of
                     fees and charges adopted by the utility for review of the plans and designs; and

                               (2) Complete the review of the plans and designs within sixty (60)
                     business days of the date the plans and designs are submitted to the utility and
                     are determined by the utility to be complete. The sixty-business-day review time
                     frame required under this subdivision (a)(2) does not include the time spent by a
                     state or federal regulatory body to provide any approvals that are required under
                     applicable state or federal regulatory requirements.

                     (b) If the utility does not complete the review in accordance with subdivision
           (a)(2), then the customer or customer representative who submitted the plan or design
           may hire a third-party plans examiner to review the plans and designs for compliance
           with all applicable state and federal regulatory requirements, codes, and local
           requirements.

                     (c) If a customer or customer representative engages a third-party plans
           examiner pursuant to subsection (b) in lieu of review by the utility, then the customer or
           customer representative shall submit the appropriate fee, if such fee was not already
           submitted, and a stamped and sealed copy of all plans that were examined to the utility
           and provide:

                               (1) The name, intended address, and local jurisdiction of the planned
                     development;

                               (2) The third-party plans examiner's name;

                               (3) A sworn statement under penalty of perjury by the third-party plans
                     examiner, declaring that the plans comply with the applicable state and federal
                     regulatory requirements, applicable codes, and local requirements, and that no
                     deficiencies remain;

                                                                 3
HB542

                              (4) A statement of the state and federal regulatory requirements used to
                    perform the plans examination;

                              (5) A statement of the applicable codes of the local jurisdiction and the
                    codes used to perform the plans examination;

                              (6) A statement of the local requirements of the utility used to perform the
                    plans examination;

                              (7) The occupancy classification of the structure;

                              (8) Evidence of the examiner's eligibility to serve as a third-party
                    examiner, including all necessary proof of insurance; and

                              (9) Other information as the utility may reasonably require.

                    (d) No later than ten (10) business days after submission of the documents
          required under subsection (c), the utility shall:

                              (1) Approve the plans, if the plans comply with state and federal
                     regulatory requirements, local standards, and applicable codes;

                               (2) Provide to the customer or customer representative a report of
                     deficiencies; or

                               (3) Request additional information necessary to ensure compliance with
                     state and federal regulatory requirements, local standards, and applicable codes.

                     (e) If ten (10) business days pass and the utility fails to take an action as required
           by subsection (d), then the utility must refund any associated plan review fees that were
           collected, and the plans are deemed approved by the utility.

                     (f) If the plan of development is approved after review by a third-party plans
           examiner and the customer engages an approved contractor to install or construct utility
           infrastructure, the utility shall perform inspections of the installation and construction of
           the utility infrastructure in the development. The utility may also inspect materials and
           test the utility infrastructure as part of such inspections. The customer or its approved
           contractor is responsible for the costs of correcting any deficiencies in the installation
           and construction, and the utility is not required to accept or commission the utility
           infrastructure until the utility determines that the installation and construction complies
           with all applicable requirements under this part. The utility may charge a reasonable fee
           for such inspections and testing in accordance with a schedule of fees or charges
           adopted by the utility and made publicly available.

                     (g) This section does not apply to the types of plans and designs of utility
           infrastructure that are customarily prepared by the utility for the customer in accordance
           with a standard practice that is in effect at the utility as of July 1, 2025, or a policy that is
           subsequently adopted by the utility.

            7-51-2605. Regulatory compliance.

                      In the event that an obligation under this part conflicts with an applicable state or
           federal regulatory requirement, the applicable state or federal regulatory requirement
           controls and supersedes any obligation of the utility under this part to the extent
            necessary to resolve the conflict.

            7-51-2606. Excused delay.

                      In the event that an act of God, fire, flood, storm, accident, or similar event
            constituting force majeure causes a utility to require more time to meet the review
            requirements of this part, then the timelines set forth in this part must be suspended for
            so long as the utility's operations are impacted by one (1) or more such events.

                                                                  4
HB542
          SECTION 2. The headings in this act are for reference purposes only and do not

constitute a part of the law enacted by this act. However, the Tennessee Code Commission is
requested to include the headings in any compilation or publication containing this act.

          SECTION 3. This act takes effect July 1, 2025, the public welfare requiring it, and
applies to plans of development submitted on or after that date.

                                                              5
                    HOUSE BILL NO. 542

PASSED:  April21,2025

                       c3

                           CAMERON SEXTON, SPEAKER
                          HOUSE OF REPRESENTATIVES

                       \""2-~=4 "'-'-'1'S);~
                       \                RANDY MCI

                       SPEAKER OF THE SENATE

~ APPROVED this 21 ~+ day of            2025

BILL LEE, GOVERNOR
Every fact on this page links to its source, starting with the official bill record.