Tennessee General Assembly· HB 1847Transmitted to Governor for his action.

Computers and Electronic Processing - As enacted, generally prohibits a municipality or electric utility to pay or absorb the cost of electrical infrastructure incurred to serve a data center; makes related changes. - Am, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Tennessee General Assembly, fetched 2026-09-25. Page and line markers are part of the official record; nothing is edited or removed. This is the chaptered version. The official bill page.
..• •;~.!~g
  •·v:---~

/~"i;-7~,~i

::0~1t/;-A'.G.~R..!.c-u-·i; 'URE \l....,):

: ~\\  ~/ {  1:?J :

                        ~tate of utennessee

                           PUBLIC CHAPTER NO. 961

                                                  HOUSE BILL NO. 1847

                       By Representatives Butler, Barrett, Reneau, Howell, Hawk

                                       Substituted for: Senate Bill No. 2128

  By Senators Taylor, Walley, Yager, Bailey, Bowling, Crowe, Gardenhire, Lowe, Powers,
                                                            Stevens

         AN ACT to amend Tennessee Code Annotated, Title 5; Title 6; Title 7; Title 13 and Title
65, relative to data centers.

BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE:

          SECTION 1. Tennessee Code Annotated, Title 7, is amended by adding the following as
a new chapter:

          7-70-101. Chapter definitions.

                    As used in this chapter:

                              (1) "Cost of electrical infrastructure" means the costs, capitalized under
                    generally accepted accounting principles, of purchasing, constructing, installing,
                    or equipping infrastructure that are incurred by a developer, owner, or operator of
                    a data center, a municipality, or an electric utility and that would not be incurred
                    but for the actual or expected increase in electric demand resulting from a newly
                    constructed or expanded data center;

                              (2) "Data center":

                                        (A) Means a building that:

                                                  (i) Primarily contains:

                                                            (a) Electronic equipment used to process, store, or
                                                  transmit digital information; and

                                                            (b) Environmental control equipment necessary to
                                                  maintain proper operating conditions for the electronic
                                                  equipment described in subdivision (2)(A)(i)(a); and

                                                  (ii) Is projected to have a peak electric demand of fifty
                                        megawatts (50 MW) or more during the first three (3) years of
                                        operation; and

                                        (8) Does not include:

                                                  (i) A facility owned or operated by the state of Tennessee;
                                        or

                                                  (ii) A facility owned or operated by a provider of
                                        telecommunications1 broadband, internet, cable, mobile, or
                                        wireless telecommunications services, or by a broadband internet
                                        access provider, if the facility primarily supports
                                        telecommunications or wireless telecommunications network
                                        operations or broadband internet access services;

                              (3) "Electric cooperative" means a nonprofit cooperative organized under,
                    or otherwise subject to, the Rural Electric and Community Services Cooperative
                    Act, compiled in title 65, chapter 25;
HB1847

                             (4) "Electric service" means the furnishing of electricity for lighting,
                   heating, power, or other uses;

                             (5) "Electric utility" means:

                                       (A) A municipal electric authority created pursuant to chapter 36 of
                             this title;

                                       (B) A municipal electric plant operated pursuant to chapter 52,
                             part 1 of this title;

                                       (C) A public electric utility;

                                       (D) An electric utility operated by a county, metropolitan
                             government, municipality, or other political subdivision of this state; or

                                       (E) An electric cooperative;

                             (6) "Independent power producer" means an individual, partnership,
                   cooperative, association, corporation, joint stock company, limited liability
                   company, or other entity, including the entity's lessees, trustees, or receivers
                   appointed by a court, that:

                                       (A) Owns, operates, manages, or controls, within this state, a
                             facility, system, plant, or equipment used to generate or store electric
                             energy;

                                       (B) Sells, or agrees to sell, electric energy, capacity, or other
                             related or ancillary services from the facility, system, plant, or equipment
                             described in subdivision (6)(A) pursuant to one (1) or more written
                             agreements with one (1) or more of the following:

                                                 (i) A data center owner or operator for the end-use
                                       consumption of the electric energy, capacity, or other related or
                                       ancillary services; or

                                                 (ii) A wholesale purchaser of the electric energy, capacity,
                                       or other related or ancillary services, including an electric utility or
                                       the Tennessee valley authority; and

                                       (C) Does not include an individual or entity that holds out electric
                             energy, capacity, or other related or ancillary services for sale to a
                             customer other than a data center owner or operator described in
                             subdivision (6)(B)(i) or a wholesale purchaser described in subdivision
                             (6)(B)(ii);

                             (7) "Infrastructure" means electrical transmission and distribution facilities,
                   including transmission and distribution lines, service lines and conductors,
                   substations, transformers, switching stations, metering equipment, protection and
                   control equipment, and related equipment and appurtenances, and includes
                   rights-of-way and easements necessary to construct, operate, or maintain the
                   facilities, if the facilities are owned by an electric utility or a municipality;

                             (8) "Municipality" means a county, metropolitan government, or
                   incorporated city or town in this state; and

                             (9) "Public electric utility" means a public utility, as defined in § 65-4-101,
                   that provides electric service.

          7-70-102. No subsidies for cost of electrical infrastructure - Independent power
production to serve data centers.

                   (a) Except as otherwise provided in this section, a municipality or electric utility
         shall not pay, or otherwise absorb, the cost of electrical infrastructure incurred to serve a
         data center.

                                                              2
HB1847

                    (b) An electric utility may assign or allocate a portion of the electric utility's costs
          associated with the cost of electrical infrastructure to general utility system
          improvements if:

                              (1) The associated improvements include improvements beyond those
                    necessary to deliver electric service to the data center;

                              (2) The associated improvements may be used to deliver electric service
                    outside the data center while continuing to provide the same electric service to
                    the electric utility's existing customers;

                              (3) The costs are incurred in connection with the repair, maintenance, or
                    replacement of infrastructure for which a person other than the electric utility
                    originally incurred the cost of electrical infrastructure; and

                              (4) The assignment or allocation is made in accordance with the electric
                    utility's contribution-in-aid-of-construction policies, or the electric utility's other
                    policies or practices, governing the assignment or allocation of the costs.

                    (c) An electric utility may reimburse a data center owner or operator for the cost
          of electrical infrastructure incurred by the data center owner or operator if:

                              (1) The reimbursement is made in accordance with the electric utility's
                    standard policies or procedures;

                              (2) The policies or procedures apply to customers receiving comparable
                    service from the electric utility;

                              (3) The policies or procedures are not exclusively applicable to data
                    centers;

                              (4) The policies or procedures do not result in more favorable
                    reimbursement to the data center than to other customers receiving comparable
                    service; and

                              (5) The reimbursement does not cause existing customers to incur a rate
                    increase.

                    (d) A municipality or electric utility is not liable to an individual or entity for
          refusing to honor an obligation that is void under this section.

                    (e) A data center may purchase and receive electric energy, capacity, or other
          related or ancillary services from an independent power producer located in this state.
          An independent power producer located in this state may generate, store, sell, or deliver
          electric energy, capacity, or other related or ancillary services to a data center through:

                              (1) A direct interconnection behind the data center's meter if the data
                    center does not take service from an electric utility;

                              (2) A direct interconnection behind the data center's meter with the written
                    approval of the applicable electric utility if the data center takes service from an
                    electric utility; or

                              (3) Access to transmission or distribution facilities owned or operated by
                    one (1) or more electric utilities or the Tennessee valley authority.

                    (f) The activities authorized by subsection (e) are subject to applicable federal
          law.

                    (g) Except to the extent federal law provides otherwise, access to transmission or
          distribution facilities under subdivision (e)(3) is provided at the election of, and on terms
          and conditions established by, the owner of the transmission or distribution facilities.

                    (h) This section does not supersede an obligation imposed upon an electric utility
          by federal law or a binding order of a federal agency of competent jurisdiction.

                                                                3
HB1847
                    (i) If this section conflicts with a term, condition, rate schedule, or requirement of

          the Tennessee valley authority, then the term, condition, rate schedule, or requirement
          of the Tennessee valley authority controls, and an electric utility is not required to comply
         with this section to the extent of the conflict.
          SECTION 2. Tennessee Code Annotated, Section 65-4-101 (6), is amended by adding
the following as a new subdivision:

                    (E) "Public utility" does not include an independent power producer, as defined in
          § 7-70-101, solely because the independent power producer owns, operates, manages,
          or controls an electric generating or storage facility in this state and sells or delivers
          electric energy, capacity, or other related or ancillary services to a data center pursuant
          to an agreement under§ 7-70-102(e).
          SECTION 3. The headings in this act are for reference purposes only and do not
constitute a part of the law enacted by this act. However, the Tennessee Code Commission is
requested to include the headings in any compilation or publication containing this act.
          SECTION 4. This act takes effect upon becoming a law, the public welfare requiring it,
and applies to conduct occurring and contracts or agreements entered into, amended, or
renewed on or after that date.

                                                                4
                    HOUSE BILL NO. 1847

PASSED:  April 22, 2026

                         c-'~

                         CAMERONSEXTON,SPEAKER
                         HOUSE OF REPRESENTATIVES

                                             RANDY MCNALI-Y
                                SPEAKER OF THE SENAtE

v:Y\i ,. 'Jc 7 APPROVED this tf)... day of  2026

                    •

                            ~-

BILL LEE, GOVERNOR