govt.fyi
Back to SB 375
Oklahoma Legislature· SB 375Becomes law without Governor's signature 05/14/2025

An act relating to project solicitation, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Oklahoma Legislature, fetched 2026-07-23. Page and line markers are part of the official record; nothing is edited or removed. The official bill page.
1                  STATE OF OKLAHOMA

1

2                 1st Session of the 60th Legislature (2025)

2

3 SENATE BILL 375                By: Frix

3

4

4

5

5

6                                AS INTRODUCED

6

7   An Act relating to project solicitation; amending 69

7   O.S. 2021, Sections 708.1 and 708.2, which relate to

8   definitions and solicitation to construction

8   managers; updating statutory references; defining

9   term; requiring certain disclosure related to

9   construction inspectors; subjecting change in the

10  selection of construction inspectors to certain

10  approval; and providing an effective date.

11

11

12

12

1 3 BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA:

13

14  SECTION 1.     AMENDATORY    69 O.S. 2021, Section 708.1, is

14

1 5 amended to read as follows:

15

16  Section 708.1. As used in Sections 4 708.2 and 5 708.3 of this

16

1 7 act title:

17

18  1. "Authority" means the Oklahoma Transportation Authority;

18

19  2. "Construction inspector" means an individual using

19

2 0 engineering skills to determine structural soundness and compliance

20

2 1 with specifications, building codes, and other regulations;

21

22  3. "Construction manager" means any individual, firm,

22

2 3 corporation, association, partnership, copartnership, or any other

23

2 4 legal entity possessing the qualifications to provide services of

24

    Req. No. 217                                                 Page 1
1 construction management which include, but are not necessarily

1

2 limited to, design review, scheduling, cost control, value

2

3 engineering, constructability evaluation, preparation, and

3

4 coordination of bid packages and construction administration;

4

5   3. 4. "Department" means the Department of Transportation;

5

6   4. 5. "Design consultant" means an individual or legal entity

6

7 possessing the qualifications to provide licensed architectural,

7

8 registered engineering, or registered land surveying services for

8

9 the design of a transportation public work improvement project; and

9

10  5. 6. "Public work improvement" means any highway, bridge,

10

1 1 street, sewer, pavement, waterline, sidewalk, or any other

11

1 2 improvement to a transportation facility which is constructed,

12

1 3 altered, or repaired, under contract with the Department or the

13

1 4 Authority.

14

15  SECTION 2.    AMENDATORY     69 O.S. 2021, Section 708.2, is

15

1 6 amended to read as follows:

16

17  Section 708.2. A. The Department of Transportation and the

17

1 8 Oklahoma Turnpike Authority shall each compile a list of all persons

18

1 9 and entities interested in and capable of performing construction

19

2 0 management and design consultant services specific to the

20

2 1 transportation industry. The consultant list shall include, but

21

2 2 shall not be limited to, qualified construction managers and design

22

2 3 consultants capable of performing such services as solicited from

23

2 4 the Office of Management and Enterprise Services file on an annual

24

    Req. No. 217                                                Page 2
1 basis. The Department and the Authority shall each determine the

1

2 qualifications of the prospective construction managers and design

2

3 consultants. The construction managers and design consultants shall

3

4 be selected at the discretion of the Department or the Authority.

4

5   B. The Department or the Authority shall issue a solicitation

5

6 to construction managers or design consultants capable of providing

6

7 the services desired. The solicitation shall, at a minimum,

7

8 contain:

8

9   1. A description and scope of the projects project;

9

10  2. An estimated construction cost, anticipated starting date,

10

1 1 and completion date the Department or the Authority desires for the

11

1 2 project;

12

13  3. A certification of funds available for the construction

13

1 4 manager or design consultant fee, including federal, state, or other

14

1 5 participation;

15

16  4. Information disclosing whether the project shall utilize a

16

1 7 construction inspector and, if so, whether the construction

17

1 8 inspector shall be an employee of the Department, the Authority, or

18

1 9 an entity that provides construction inspector services, and the

19

2 0 name of such entity;

20

21  5. The closing date for the construction manager or design

21

2 2 consultant to give notice of interest; and

22

23  5. 6. Additional data the Department or the Authority requires

23

2 4 from the construction manager or design consultant. The closing

24

    Req. No. 217                                                 Page 3
1 date for submission of construction manager or design consultant

1

2 notice of interest for consideration shall be within thirty (30)

2

3 days of the date the notice is issued by the Department or the

3

4 Authority.

4

5   C. The Department or the Authority shall review the

5

6 qualifications of the entities on the consultant list and shall

6

7 select no less than three and no more than five consultants per

7

8 contract for further consideration. The review shall include

8

9 consideration of the following information:

9

10  1. Professional qualifications for the type of work

10

1 1 contemplated;

11

12  2. Capacity for completing the project in the specified time

12

1 3 period;

13

14  3. Past performance on projects of a similar nature; and

14

15  4. Percentage of work to be performed by residents of Oklahoma.

15

16  D. The Department and the Authority shall each establish a

16

1 7 committee which will evaluate the construction managers or design

17

1 8 consultants selected for consideration and rank the construction

18

1 9 managers or design consultants in order of preference.

19

20  E. The Department or the Authority shall enter into

20

2 1 negotiations with the first-choice consultant. If the Department or

21

2 2 Authority and the first-choice consultant cannot reach an agreement,

22

2 3 their negotiations shall be terminated and negotiations with the

23

2 4 second-choice consultant shall commence. If the Department or the

24

    Req. No. 217                                            Page 4
1 Authority and the second-choice consultant cannot reach an

1

2 agreement, their negotiations shall be terminated and negotiations

2

3 with the third-choice consultant shall commence. If the Department

3

4 or the Authority and the third-choice consultant cannot reach an

4

5 agreement, then all negotiations shall be terminated. Should the

5

6 Department or the Authority be unable to negotiate a satisfactory

6

7 contract with any of the three selected consultants, the Department

7

8 or the Authority shall reevaluate the proposed work and send out a

8

9 new notice.

9

10  F. As provided for in the Transportation Commission rules or by

10

1 1 Authority resolutions, the Department or the Authority shall perform

11

1 2 a written evaluation of the services provided by the consultant.

12

1 3 This evaluation shall become a part of the Department's and the

13

1 4 Authority's consultant file. Failure of the consultant to perform

14

1 5 the prescribed work in a timely and accurate manner shall be grounds

15

1 6 for exclusion from the list of qualified construction managers or

16

1 7 design consultants until such time as the consultant can reasonably

17

1 8 document and demonstrate performance improvement to the satisfaction

18

1 9 of the Department or the Authority.

19

20  G. As provided for in the Transportation Commission rules or by

20

2 1 Authority resolutions, the Department or the Authority may enter

21

2 2 into demand services contracts for consultant services to provide a

22

2 3 specific project work type or activity for unspecified projects or

23

2 4 facilities on an as-needed basis. When soliciting and securing such

24

    Req. No. 217                                              Page 5
1 services, the Department and the Authority shall utilize the

1

2 procedure as set forth in this section.

2

3   H. Any change in the selection of the construction inspector of

3

4 a project that would be contrary to the information disclosed in the

4

5 solicitation for such project is subject to the approval of the

5

6 Transportation Commission or the Oklahoma Turnpike Authority.

6

7   SECTION 3. This act shall become effective November 1, 2025.

7

8

8

9   60-1-217      MSBB  1/14/2025 3:50:42 PM

9

10

10

11

11

12

12

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24

    Req. No. 217                              Page 6
Every fact on this page links to its source, starting with the official bill record.