Oklahoma Legislature· SB 345Coauthored by Representative Cantrell (principal House author)

An act relating to the Oklahoma Underground 7 Facilities Damage Prevention Act, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Oklahoma Legislature, fetched 2026-07-23. Page and line markers are part of the official record; nothing is edited or removed. The official bill page.
1                          STATE OF OKLAHOMA

1

2                  1st Session of the 60th Legislature (2025)

2

3 SENATE BILL 345              By: Frix
3

4

4

5

5

6                          AS INTRODUCED

6

7   An Act relating to the Oklahoma Underground

7   Facilities Damage Prevention Act; amending 63 O.S.

8   2021, Section 142.2, as last amended by Section 1,

8   Chapter 118, O.S.L. 2024 (63 O.S. Supp. 2024, Section

9   142.2), which relates to definitions; modifying

9   certain definition; updating statutory language;

10  updating statutory references; and providing an

10  effective date.

11

11

12

12

13 BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA:
13

14  SECTION 1.     AMENDATORY  63 O.S. 2021, Section 142.2, as

14

15 last amended by Section 1, Chapter 118, O.S.L. 2024 (63 O.S. Supp.
15

16 2024, Section 142.2), is amended to read as follows:
16

17  Section 142.2. As used in the Oklahoma Underground Facilities

17

18 Damage Prevention Act:
18

19  1. "Certified project" means a project where the public agency

19

20 responsible for the public project, in consultation with the
20

21 statewide one-call notification center, as part of its procedure,
21

22 certifies that the project right-of-way is free and clear of
22

23 underground facilities or wherein the public agency responsible for
23

24 such project, as part of its procedure, notifies all persons
24

    Req. No. 1241                                              Page 1
1 determined by the public agency to have underground facilities
1

2 located within the construction right-of-way and certifies that all
2

3 known underground facilities are duly located or noted on the
3

4 engineering drawings for the project;
4

5   2. "Damage" means any impact upon or removal of support from an

5

6 underground facility as a result of explosion, excavation, or
6

7 demolition which according to the operating practices of the
7

8 operator of the underground facilities would necessitate the repair
8

9 thereof;
9

10  3. "Demolish" means to wreck, raze, render, move, or remove a

10

11 structure by means of any equipment or explosive;
11

12  4. "Demolition" means the act or operation of demolishing a

12

13 structure;
13

14  5. "Excavate" means to dig, compress, or remove earth, rock, or

14

15 other materials in or on the ground by use of mechanized equipment
15

16 or blasting, including, but not necessarily limited to, augering,
16

17 boring, backfilling, drilling, grading, pile driving, plowing in,
17

18 pulling in, trenching, tunneling, and plowing; provided, however,
18

19 that neither:
19

20          a. the moving of earth by tools manipulated only by human

20

21                 or animal power, except in a private or public

21

22                 easement or right-of-way,

22

23          b. the moving of earth by tools manipulated only by human

23

24                 power for burying communication lines of a

24

    Req. No. 1241                                              Page 2
1                  communications provider in a private or public

1

2                  easement or right-of-way when depth is not greater

2

3                  than twelve (12) inches and within twelve (12) inches

3

4                  of a communications provider terminal,

4

5   c. any form of cultivation for agricultural purposes, nor

5

6                  any augering, dozing by noncommercial dozer operators,

6

7                  or digging for postholes, farm ponds, land clearing or

7

8                  other normal agricultural purposes,

8

9   d. routine maintenance,

9

10  e. work by a public agency or its contractors on a

10

11                 preengineered project,

11

12  f. work on a certified project,

12

13  g. work on a permitted project,

13

14  h. the opening of a grave in a cemetery,

14

15  i. a solid waste disposal site which is a preengineered

15

16                 project, nor

16

17  j. any individual excavating on his or her own property

17

18                 and who is not in the excavating business for hire,

18

19                 except in a private or public easement or right-of-

19

20                 way,

20

21 shall be deemed excavation;
21

22  6. "Excavation" means the act or operation of excavating;

22

23  7. "Excavator" means a person or public agency that intends to

23

24 excavate or demolish within this state;
24

    Req. No. 1241                                          Page 3
1   8. "Notification center" means the statewide center currently

1

2 known as the Oklahoma One-Call System, Inc., which has as one of its
2

3 purposes to receive notification of planned excavation and
3

4 demolition in a specified area from excavators, and to disseminate
4

5 such notification of planned excavation or demolition to operators
5

6 who are members and participants;
6

7   9. "Operator" shall mean and include any person or public

7

8 agency owning or operating underground facilities;
8

9   10. "Permitted project" means a project where a permit for the

9

10 work to be performed must be issued by a state or federal agency
10

11 and, as a prerequisite to receiving such permit, the applicant must
11

12 locate all underground facilities in the area of the work and in the
12

13 vicinity of any blasting and notify each owner of such underground
13

14 facilities;
14

15  11. "Person" includes any individual, partnership, corporation,

15

16 association, cooperative, trust, or other entity, including a person
16

17 engaged as a contractor by a public agency, but not including a
17

18 public agency;
18

19  12. "Preengineered project" means a public project wherein the

19

20 public agency responsible for such project, as part of its
20

21 engineering and contract procedures, holds a meeting prior to the
21

22 commencement of any construction work on such project in which all
22

23 persons, determined by the public agency, in consultation with the
23

24 statewide one-call notification center, to have underground
24

    Req. No. 1241                                               Page 4
1 facilities located within the construction area of the project are
1

2 invited to attend and given an opportunity to verify or inform the
2

3 public agency of the location of their underground facilities, if
3

4 any, within the construction area and where the location of all
4

5 known underground facilities are duly located or noted on the
5

6 engineering drawing and specifications for the project;
6

7   13. "Public agency" means the state or, any board, commission,

7

8 or agency of the state, or a county of this state;
8

9   14. "Routine maintenance" means the grading of roads and barrow

9

10 or drainage ditches, the removal and replacement of pavement,
10

11 including excavation relating thereto, and the installation and
11

12 maintenance of drainage and bridge facilities, signs, guardrails,
12

13 and electrical and communications facilities in or on the public
13

14 rights-of-way by a public agency;
14

15  15. "Underground facility" means any underground line, cable,

15

16 facility, system, and appurtenances thereto, for producing, storing,
16

17 conveying, transmitting, or distributing communication (including
17

18 voice, video, or data information), electricity, power, light, heat,
18

19 intrastate and interstate gas pipelines, as described in 49 CFR
19

20 C.F.R., Part 192.1, intrastate and interstate hazardous liquid or
20

21 carbon dioxide pipelines, as described in 49 CFR C.F.R., Part 195.1,
21

22 water (including storm water), steam, sewage and other commodities,
22

23 and any oil and gas pipeline located in a private or public easement
23

24 or right-of-way;
24

    Req. No. 1241                                          Page 5
1   16. "Design" or "survey" means a notice to facility operators

1

2 to provide underground facility information during the design or
2

3 engineering phase of a project to mitigate potential impact to
3

4 existing underground facilities;
4

5   17. "Watch and protect" means an operator or its designated

5

6 representative is present to observe an excavation within ten (10)
6

7 feet of the operator's marking of its existing underground facility;
7

8   18. "Pre-excavation meeting request" means a notice to

8

9 underground facility operators to participate in scheduled meetings
9

10 for the purpose of planning large projects and coordinate resources
10

11 accordingly; and
11

12  19. "Large projects" are those excavation projects that involve

12

13 one of the following:
13

14  a. exceeds distances defined in paragraph 5 of subsection

14

15                 D of Section 142.6 of this title, or

15

16  b. estimated duration is more than ninety (90) days.

16

17  SECTION 2. This act shall become effective November 1, 2025.

17

18

18

19  60-1-1241        MSBB  1/3/2025 9:39:27 AM

19

20

20

21

21

22

22

23

23

24

24

    Req. No. 1241                                           Page 6