govt.fyi
Back to SB 1766
Oklahoma Legislature· SB 1766Second Reading referred to Rules

An act relating to the Corporation Commission, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Oklahoma Legislature, fetched 2026-07-23. Page and line markers are part of the official record; nothing is edited or removed. The official bill page.
1                            STATE OF OKLAHOMA

1

2                  2nd Session of the 60th Legislature (2026)

2

3 SENATE BILL 1766                 By: McIntosh
3

4

4

5

5

6                            AS INTRODUCED

6

7   An Act relating to the Corporation Commission;

7   defining terms; requiring certain consideration;

8   establishing criteria for certain petition; requiring

8   establishment of certain evidence; requiring the

9   Corporation Commission to make certain finding;

9   establishing requirements for certain approval;

10  construing provision; clarifying applicability;

10  providing for codification; and providing an

11  effective date.

11

12

12

13

13

14 BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA:
14

15  SECTION 1.      NEW LAW  A new section of law to be codified

15

16 in the Oklahoma Statutes as Section 295 of Title 17, unless there is
16

17 created a duplication in numbering, reads as follows:
17

18  A. As used in this section:

18

19  1. "Bulk-power system" means:

19

20  a. facilities and control systems necessary to operate an

20

21                 interconnected electricity energy transmission network

21

22                 or portion thereof, and

22

23  b. electric energy from generation facilities needed to

23

24                 maintain transmission system reliability;

24

    Req. No. 3551                                              Page 1
1   2. "Capacity" means the fraction of the installed capacity of

1

2 an electric generation unit which can be relied on at a given time
2

3 to meet demand and is frequently measured either in terms of the
3

4 physical output capacity of the unit such as kilowatt (kW), megawatt
4

5 (MW), or gigawatt (GW) or as the fractional output percentage of the
5

6 asset's nameplate capacity;
6

7   3. "Effective load or demand carrying capacity" means an

7

8 electric generation unit's contribution to reliability based on the
8

9 incremental quantity of load or demand that can be satisfied by
9

10 adding that resource asset to the electric power grid;
10

11  4. "Electric generation unit" means any asset used to generate

11

12 or store electricity, regardless of fuel source including, but not
12

13 limited to, coal, natural gas, nuclear fuel, hydroelectricity,
13

14 geothermal, wind, solar, hydrogen, or other applicable technologies.
14

15 It shall include, but is not limited to, pumped hydroelectric
15

16 storage, lithium-ion batteries, and any other device or asset used
16

17 to store energy for later use as electricity;
17

18  5. "Electric utility" means any person, firm, partnership, or

18

19 corporation that furnishes retail electric service to the public in
19

20 this state and is subject to the regulatory jurisdiction of the
20

21 Corporation Commission;
21

22  6. "Independent system operator" means a regional transmission

22

23 organization, independent system operator, independent transmission
23

24 provider, or other transmission organization finally approved by the
24

    Req. No. 3551                                          Page 2
1 Federal Energy Regulatory Commission for the operation of
1

2 transmission facilities;
2

3   7. "Reliability" means a requirement, approved by the Federal

3

4 Energy Regulatory Commission, to provide for reliable operation of
4

5 the bulk-power system. It includes requirements for the operation
5

6 of existing bulk-power system facilities, including cybersecurity
6

7 protection, and the design of planned additions or modifications to
7

8 such facilities to the extent necessary to provide for reliable
8

9 operation of the bulk-power system. It does not include any
9

10 requirement to enlarge such facilities or to construct new
10

11 transmission capacity or generation capacity;
11

12  8. "Reliable operation" means operating the elements of the

12

13 bulk-power system within equipment and electric system thermal,
13

14 voltage, and stability limits so that instability, uncontrolled
14

15 separation, or cascading failures of such system will not occur as a
15

16 result of a sudden disturbance, including a cybersecurity incident,
16

17 or unanticipated failure of system elements;
17

18  9. "Retire" means any scale down, scale back, intent for lesser

18

19 usage, or any other similar action with respect to an electric
19

20 generation unit or a transmission asset;
20

21  10. "Transmission asset" means any and all equipment necessary

21

22 to transmit electricity from a new or existing electric generation
22

23 unit to the distribution network used to provide electricity to an
23

24 end consumer. It includes, but is not limited to, any and all
24

    Req. No. 3551                                              Page 3
1 substations, inverters, transformers, transmission towers, and
1

2 additional transmission mileage operating above sixty-nine kilovolts
2

3 (69 kV); and
3

4   11. "Transmission organization" means a regional transmission

4

5 organization, independent system operator, independent transmission
5

6 provider, or other transmission organization finally approved by the
6

7 Federal Energy Regulatory Commission for the operation of
7

8 transmission facilities.
8

9   B. When a public utility requests a rate adjustment, the

9

10 Corporation Commission shall take into consideration the bulk-power
10

11 system reliability, energy capacity, on-demand dispatch ability,
11

12 useful life, intermittent operational nature, overall operational
12

13 costs including back end disposal costs, and environmental
13

14 compliance costs of each and every asset used for the production or
14

15 transmission of electric energy including, but not limited to, any
15

16 electric generation unit, transmission asset, and other related
16

17 assets in its determination of whether the costs and expenses of
17

18 related costs and expenses are fair, just, reasonable, and should be
18

19 approved for rate recovery.
19

20  C. In addition to the requirements of a petition requesting the

20

21 Commission to examine and determine the reasonableness of a proposed
21

22 increase in rates and charges pursuant to Section 152 of Title 17 of
22

23 the Oklahoma Statutes, the petition shall include the following:
23

24

24

    Req. No. 3551                                              Page 4
1   1. A statement for each electric generation unit that is

1

2 proposed to be added to the generation portfolio which shall
2

3 include:
3

4           a. an evaluation of each generation unit's potential

4

5                  ability to reliably meet the applicant's capacity

5

6                  contributions to bulk-power system reliability during

6

7                  times of peak demand,

7

8           b. an assessment of the potential estimated percentage

8

9                  contribution of each generation unit in meeting the

9

10                 applicant's capacity contributions to bulk-power

10

11                 system reliability during times of peak demand, and

11

12          c. a narrative that outlines the addition of each

12

13                 electric generation unit when considered in

13

14                 conjunction with any proposed retirement with respect

14

15                 to any other electric generation and how this will

15

16                 impact the applicant's ability to meet capacity

16

17                 contributions to bulk-power system reliability during

17

18                 times of peak demand;

18

19  2. A statement for each electric generation unit that the

19

20 applicant proposes to retire which shall include:
20

21          a. an evaluation of each generation unit's current

21

22                 ability to reliably meet the electric utility's

22

23                 capacity contributions to bulk-power system

23

24                 reliability during times of peak demand,

24

    Req. No. 3551                                               Page 5
1   b. an assessment of the current estimated percentage

1

2                  contribution of each generation unit in meeting the

2

3                  applicant's capacity contributions to bulk-power

3

4                  system reliability during times of peak demand, and

4

5   c. a narrative that outlines how the scale down, less

5

6                  frequent utilization, retirement, or removal of each

6

7                  generation unit from the applicant's portfolio when

7

8                  considered in conjunction with any proposed addition

8

9                  of an electric generation unit to the applicant's

9

10                 portfolio will impact the applicant's ability to meet

10

11                 its capacity contributions to bulk-power system

11

12                 reliability during times of peak demand.

12

13  The statements in each of paragraphs 1 and 2 of this subsection

13

14 shall, to the best of the applicant's ability, address the effective
14

15 load carrying capacity or effective demand carrying capacity of the
15

16 electric generation unit. Such information may be indicated as the
16

17 unforced or accredited capacity of the asset and the statement may
17

18 be provided by a transmission organization, the applicant, or an
18

19 agent thereof;
19

20  3. A statement for each transmission asset the applicant

20

21 proposes to build or acquire that includes an evaluation of each
21

22 transmission asset's ability to meet its capability to support the
22

23 applicant's capacity contributions to bulk-power system reliability
23

24 during times of peak demand. The statement shall, to the best of
24

    Req. No. 3551                                            Page 6
1 the applicant's ability, address how the transmission asset will
1

2 support the applicant's capacity contributions to bulk-power system
2

3 reliability during times of peak demand. Such statement may be
3

4 provided by a transmission organization, the applicant, or an agent
4

5 thereof; and
5

6   4. A statement for each transmission asset the applicant

6

7 proposes to retire that includes an evaluation of each transmission
7

8 asset's current ability to meet its capability to support the
8

9 applicant's capacity contributions to bulk-power system reliability
9

10 during times of peak demand. Such statement may be provided by a
10

11 transmission organization, the applicant, or an agent thereof.
11

12  D. 1. The Corporation Commission shall not authorize or

12

13 approve the retirement of an electric generation unit in this state
13

14 until the applicant establishes, by clear and convincing evidence,
14

15 that it has available an equivalent megawatt capacity of
15

16 dispatchable firm power generation as replacement power in the
16

17 result of the proposed electric generation unit retirement. The
17

18 available megawatt capacity of dispatchable firm power may be
18

19 established by:
19

20  a. the construction and operation of a new generation

20

21                 asset either within this state or outside this state,

21

22  b. any purchase power agreement, or

22

23  c. any other arrangement, including a combination of

23

24                 subparagraphs a and b of this paragraph, that the

24

    Req. No. 3551                                            Page 7
1                  Commission determines will meet the applicant's

1

2                  capacity contributions to bulk-power system

2

3                  reliability during times of peak demand.

3

4   2. The Corporation Commission may direct an electric utility to

4

5 submit an analysis of the actions necessary to extend the life of
5

6 each generating unit in the electric utility's portfolio beyond the
6

7 planned retirement date for each generating unit. Such analysis may
7

8 include any matters as deemed necessary by the Commission.
8

9   E. Any applicant for an adjustment of electric utility rates

9

10 shall establish by clear and convincing evidence that:
10

11  1. Each electric generation unit or transmission asset that it

11

12 proposes to build or acquire shall fully meet its capacity
12

13 contributions to bulk-power system reliability during times of peak
13

14 demand; and
14

15  2. Each electric generation unit or transmission asset that it

15

16 proposes to retire will not negatively impact the applicant's
16

17 ability to fully meet its capacity contributions to bulk-power
17

18 system reliability during times of peak demand.
18

19  F. 1. If the Corporation Commission approves an adjustment of

19

20 rates, it shall include in a separate finding that the applicant
20

21 meets the requirements pursuant to this section.
21

22  2. If the Commission finds that an electric generation unit or

22

23 transmission asset that the applicant proposes to build or acquire
23

24 fails to meet the requirements of this section, the Commission shall
24

    Req. No. 3551                                               Page 8
1 determine what portion, if any, of the costs and expenses related to
1

2 and associated with that electric generation unit or transmission
2

3 asset are fair, just, and reasonable, and should be eligible for
3

4 rate recovery as well as the portion, if any, of the costs and
4

5 expenses that are not fair, just, or reasonable, and should not be
5

6 eligible for rate recovery.
6

7   3. The Commission, in its discretion, may approve in part, deny

7

8 in part, approve, or deny any portion of an applicant's petition.
8

9   4. In any order approving an adjustment of rates, the

9

10 Commission shall include in a separate and distinct paragraph in
10

11 boldface type for each of the following that describes:
11

12  a. the total dollar amount of the increase in approved

12

13                 rate recovery,

13

14  b. whether a rate of return on any electric generation

14

15                 unit or transmission asset has been approved, the

15

16                 amount of the rate of return reflected as a percentage

16

17                 of the total dollar amount approved for such return

17

18                 and the duration of such return, and

18

19  c. a summary of the total amount of the electric

19

20                 generation unit and transmission asset costs and

20

21                 expenses, if any, that have been denied for rate

21

22                 recovery.

22

23  G. Nothing in this section shall be construed to require the

23

24 disclosure of confidential information.
24

    Req. No. 3551                                           Page 9
1   H. Any agreed order of settlement or similar instrument among

1

2 the parties shall not circumvent the requirements of this section or
2

3 any other applicable law and shall not abrogate the responsibility
3

4 of the Commission to make the findings pursuant to subsection F of
4

5 this section.
5

6   SECTION 2. This act shall become effective November 1, 2026.

6

7

7

8   60-2-3551      CN  1/14/2026 3:20:18 PM

8

9

9

10

10

11

11

12

12

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24

    Req. No. 3551                            Page 10
Every fact on this page links to its source, starting with the official bill record.