govt.fyi
Back to SB 1003
Oklahoma Legislature· SB 1003Failed in Committee - Energy

An act relating to the Corporation Commission, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Oklahoma Legislature, fetched 2026-07-23. Page and line markers are part of the official record; nothing is edited or removed. The official bill page.
1                            STATE OF OKLAHOMA

1

2                1st Session of the 60th Legislature (2025)

2

3 SENATE BILL 1003               By: Stewart
3

4

4

5

5

6

6

7                            AS INTRODUCED

7

8   An Act relating to the Corporation Commission;

8   defining terms; requiring the Commission to

9   promulgate rules; establishing provisions for the

9   consideration of electric grid qualifications;

10  prohibiting approval of certain actions by the

10  Commission; providing for certain considerations for

11  the retiring of certain electric generation

11  mechanisms; directing coordination with regional

12  transmission organizations; providing for

12  codification; and providing an effective date.

13

13

14

14

15

15

16 BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA:
16

17  SECTION 1.      NEW LAW  A new section of law to be codified

17

18 in the Oklahoma Statutes as Section 295 of Title 17, unless there is
18

19 created a duplication in numbering, reads as follows:
19

20  A. As used in this section:

20

21  1. "Firming power" means power sources that can provide at

21

22 least forty-eight (48) hours of back-up power to intermittent
22

23 generation at the expected maximum level of power provided by the
23

24

24

    Req. No. 59                                              Page 1
1 intermittent generation, predicted using an industry-standard
1

2 methodology;
2

3   2. "Guaranteed power capacity" means the sum of the on-demand

3

4 power and firming power available, calculated without double-
4

5 counting any power source;
5

6   3. "Intermittent generation" means electric generation that

6

7 requires intermittent sources of energy such as sunlight or wind;
7

8   4. "On-demand power" means electric power from sources that do

8

9 not depend on intermittent sources of energy such as sunlight or
9

10 wind and whose output can be provided within eight (8) hours and
10

11 controlled to meet changes in demand. Provided, on-demand power
11

12 does not include electric power from batteries or other storage
12

13 mechanisms that are charged in whole or in part by intermittent
13

14 generation; and
14

15  5. "Peak net load" means the estimated peak demand minus the

15

16 estimated minimum level of power provided by intermittent generation
16

17 at the time of peak demand, predicted using an industry-standard
17

18 methodology.
18

19  B. The Corporation Commission shall promulgate rules and

19

20 procedures to ensure that any electric grid serving ratepayers in
20

21 this state is affordable and reliable as set forth in this act.
21

22  C. An electric grid shall not be considered affordable and

22

23 reliable unless:
23

24

24

    Req. No. 59               Page 2
1   1. Any new power generation resource is chosen and approved

1

2 based solely on achieving the lowest total monetary cost among
2

3 available options. The lowest total monetary cost shall be
3

4 calculated by adding the total monetary cost of construction and
4

5 operation of such resource that will be charged to ratepayers, the
5

6 fiscal costs to any level of government of direct and indirect
6

7 monetary subsidies applicable to such resource, the monetary cost of
7

8 providing firming power if required by this act or otherwise, and
8

9 other system costs necessary to integrate the resource;
9

10  2. Existing power generation resources are not retired prior to

10

11 the end of their potential useful lives, including where such useful
11

12 lives can be extended through repairs or other modifications, unless
12

13 retirement results in a lower total monetary cost among available
13

14 options and the requirements of subsection E of this section are
14

15 met;
15

16  3. The grid maintains a guaranteed power capacity of at least

16

17 one hundred fifteen percent (115%) of peak net load;
17

18  4. Power generation resources serving the grid meet continuous

18

19 operating requirements for summer and winter peaks, including
19

20 extreme weather events that necessitate on-site fuel storage, dual
20

21 fuel capability, or fuel supply arrangements to ensure performance
21

22 for seven (7) days in the event of extreme weather; and
22

23  5. System-wide loss of load events, such as power shortages or

23

24 brownouts, are not expected to occur, to an industry-standard level
24

    Req. No. 59                                               Page 3
1 of certainty, more than once in ten (10) years, and for a duration
1

2 of five (5) hours or fewer.
2

3   D. The Corporation Commission shall not take any action

3

4 approving a new intermittent generation source unless the source has
4

5 the support of firming power up to the expected maximum output level
5

6 of the source for forty-eight (48) hours during periods of peak load
6

7 on the grid, and the cost of constructing or contracting for that
7

8 firming power shall be included in calculating the total monetary
8

9 cost of the intermittent generation source.
9

10  E. Guaranteed power capacity shall be a primary consideration

10

11 of the Corporation Commission when considering matters related to
11

12 the retiring or adding of electric generation. The Commission shall
12

13 not approve retiring any electric generation source that provides
13

14 on-demand power, including by approving a certificate of convenience
14

15 or a permit to build or acquire intermittent generation, unless the
15

16 utility establishes by a preponderance of the evidence that the
16

17 applicable electric grid will have, at the time of retirement, a
17

18 guaranteed power capacity equal to or greater than described in
18

19 paragraph 3 of subsection C of this section.
19

20  F. The Corporation Commission shall coordinate with regional

20

21 transmission organizations to develop policies which provide power
21

22 for the region in a cost-effective manner that is not weather-
22

23 dependent, can be controlled to meet changes in demand, and meets
23

24 the requirements prescribed by this section.
24

    Req. No. 59                                  Page 4
1   SECTION 2. This act shall become effective November 1, 2025.

1

2

2

3   60-1-59      RD  1/16/2025 2:19:54 PM

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24

    Req. No. 59                            Page 5
Every fact on this page links to its source, starting with the official bill record.