Oklahoma Legislature· HB 1666Becomes law without Governor's signature 05/18/2025

An act relating to public health and safety, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Oklahoma Legislature, fetched 2026-07-23. Page and line markers are part of the official record; nothing is edited or removed. The official bill page.
1                          STATE OF OKLAHOMA

2   1st Session of the 60th Legislature (2025)

3 HOUSE BILL 1666               By: Cantrell

4

5

6                          AS INTRODUCED

7   An Act relating to public health and safety; amending

    63 O.S. 2021, Section 142.2, as last amended by

8   Section 1, Chapter 118, O.S.L. 2024 (63 O.S. Supp.

    2024, Section 142.2), which relates to definitions

9   used in the Oklahoma Underground Facilities Damage

    Preventions Act; modifying definition; and providing

10  an effective date.

11

12

13

14 BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA:

15  SECTION 1.      AMENDATORY  63 O.S. 2021, Section 142.2, as

16 last amended by Section 1, Chapter 118, O.S.L. 2024 (63 O.S. Supp.

17 2024, Section 142.2), is amended to read as follows:

18  Section 142.2. As used in the Oklahoma Underground Facilities

19 Damage Prevention Act:

20  1. "Certified project" means a project where the public agency

21 responsible for the public project, in consultation with the

22 statewide one-call notification center, as part of its procedure,

23 certifies that the project right-of-way is free and clear of

24 underground facilities or wherein the public agency responsible for

    Req. No. 10524                                               Page 1
1 such project, as part of its procedure, notifies all persons

2 determined by the public agency to have underground facilities

3 located within the construction right-of-way and certifies that all

4 known underground facilities are duly located or noted on the

5 engineering drawings for the project;

6   2. "Damage" means any impact upon or removal of support from an

7 underground facility as a result of explosion, excavation or

8 demolition which according to the operating practices of the

9 operator of the underground facilities would necessitate the repair

10 thereof;

11  3. "Demolish" means to wreck, raze, render, move or remove a

12 structure by means of any equipment or explosive;

13  4. "Demolition" means the act or operation of demolishing a

14 structure;

15  5. "Excavate" means to dig, compress or remove earth, rock or

16 other materials in or on the ground by use of mechanized equipment

17 or blasting, including, but not necessarily limited to, augering,

18 boring, backfilling, drilling, grading, pile driving, plowing in,

19 pulling in, trenching, tunneling and plowing; provided, however,

20 that neither:

21           a. the moving of earth by tools manipulated only by human

22                or animal power, except in a private or public

23                easement or right-of-way,

24

    Req. No. 10524                                                Page 2
1   b. the moving of earth by tools manipulated only by human

2   power for burying communication lines of a

3   communications provider in a private or public

4   easement or right-of-way when depth is not greater

5   than twelve (12) inches and within twelve (12) inches

6   of a communications provider terminal,

7   c. any form of cultivation for agricultural purposes, nor

8   any augering, dozing by noncommercial dozer operators

9   or digging for postholes, farm ponds, land clearing or

10  other normal agricultural purposes,

11  d. routine maintenance,

12  e. work by a public agency or its contractors on a

13  preengineered project,

14  f. work on a certified project,

15  g. work on a permitted project,

16  h. the opening of a grave in a cemetery,

17  i. a solid waste disposal site which is a preengineered

18  project, nor

19  j. any individual excavating on his or her own property

20  and who is not in the excavating business for hire,

21  except in a private or public easement or right-of-

22  way,

23 shall be deemed excavation;

24  6. "Excavation" means the act or operation of excavating;

    Req. No. 10524                                             Page 3
1   7. "Excavator" means a person or public agency that intends to

2 excavate or demolish within this state;

3   8. "Notification center" means the statewide center currently

4 known as the Oklahoma One-Call System, Inc., which has as one of its

5 purposes to receive notification of planned excavation and

6 demolition in a specified area from excavators, and to disseminate

7 such notification of planned excavation or demolition to operators

8 who are members and participants;

9   9. "Operator" shall mean and include any person or public

10 agency owning or operating underground facilities;

11  10. "Permitted project" means a project where a permit for the

12 work to be performed must be issued by a state or federal agency

13 and, as a prerequisite to receiving such permit, the applicant must

14 locate all underground facilities in the area of the work and in the

15 vicinity of any blasting and notify each owner of such underground

16 facilities;

17  11. "Person" includes any individual, partnership, corporation,

18 association, cooperative, trust or other entity, including a person

19 engaged as a contractor by a public agency, but not including a

20 public agency;

21  12. "Preengineered project" means a public project wherein the

22 public agency responsible for such project, as part of its

23 engineering and contract procedures, holds a meeting prior to the

24 commencement of any construction work on such project in which all

    Req. No. 10524                                                  Page 4
1 persons, determined by the public agency, in consultation with the

2 statewide one-call notification center, to have underground

3 facilities located within the construction area of the project are

4 invited to attend and given an opportunity to verify or inform the

5 public agency of the location of their underground facilities, if

6 any, within the construction area and where the location of all

7 known underground facilities are duly located or noted on the

8 engineering drawing and specifications for the project;

9   13. "Public agency" means the state, county, or any board,

10 commission or agency of the state;

11  14. "Routine maintenance" means the grading of roads and barrow

12 or drainage ditches, the removal and replacement of pavement,

13 including excavation relating thereto and the installation and

14 maintenance of drainage and bridge facilities, signs, guardrails,

15 and electrical and communications facilities in or on the public

16 rights-of-way by a public agency;

17  15. "Underground facility" means any underground line, cable,

18 facility, system and appurtenances thereto, for producing, storing,

19 conveying, transmitting or distributing communication (including

20 voice, video, or data information), electricity, power, light, heat,

21 intrastate and interstate gas pipelines, as described in 49 CFR Part

22 192.1, intrastate and interstate hazardous liquid or carbon dioxide

23 pipelines, as described in 49 CFR Part 195.1, water (including storm

24

    Req. No. 10524                                                 Page 5
1 water), steam, sewage and other commodities and any oil and gas

2 pipeline located in a private or public easement or right-of-way;

3   16. "Design" or "survey" means a notice to facility operators

4 to provide underground facility information during the design or

5 engineering phase of a project to mitigate potential impact to

6 existing underground facilities;

7   17. "Watch and protect" means an operator or its designated

8 representative is present to observe an excavation within ten (10)

9 feet of the operator's marking of its existing underground facility;

10  18. "Pre-excavation meeting request" means a notice to

11 underground facility operators to participate in scheduled meetings

12 for the purpose of planning large projects and coordinate resources

13 accordingly; and

14  19. "Large projects" are those excavation projects that involve

15 one of the following:

16  a. exceeds distances defined in paragraph 5 of subsection

17              D of Section 142.6 of this title, or

18  b. estimated duration is more than ninety (90) days.

19  SECTION 2. This act shall become effective November 1, 2025.

20

21  60-1-10524       JBH  12/13/24

22

23

24