govt.fyi
Back to H3493
Massachusetts General Court· H3493Accompanied a new draft, see H4744

An Act increasing opportunities for peak energy storage, the official text

Shown verbatim: the complete text as captured from the official source posted by the Massachusetts General Court, fetched 2026-07-15. Nothing is edited or removed. The official bill page.
	Section 3 of Chapter 25A of the General Laws, as appearing in the 2022 Official Edition, is hereby amended by striking out the definition of “Qualified RPS resources” and inserting in place thereof the following definition:-
	“Qualified RPS resource”, a renewable energy generating source, as defined in subsection (c) or subsection (d) of section 11F, that has: (i) installed a qualified energy storage system at its facility; or (ii) commenced operation on or after January 1, 2019, provided, however, that a qualified RPS resource that commenced operation prior to January 1, 2019 shall be considered to have the commercial operation date of when the resource is co-located with a qualified energy storage system that commenced operation after January 1, 2019 and having a minimum nominal useful energy capacity of not less than 25 per cent of the nameplate power rating of the qualified RPS resource, or when the qualified RPS resource is contractually paired with a qualified energy storage system that commenced operation after January 1, 2019 and having a minimum nominal useful energy capacity of not less than 25 per cent of the nameplate power rating of the qualified RPS resource for 4 hours.
Every fact on this page links to its source, starting with the official bill record.