govt.fyi
Back to SB 422
Indiana General Assembly· SB 422Public Law 10

Advanced transmission technologies., the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Indiana General Assembly, fetched 2026-09-25. Page and line markers are part of the official record; nothing is edited or removed. This is the current version. The official bill page.
First Regular Session of the 124th General Assembly (2025)

PRINTING CODE. Amendments: Whenever an existing statute (or a section of the Indiana
Constitution) is being amended, the text of the existing provision will appear in this style type,
additions will appear in this style type, and deletions will appear in this style type.

 Additions: Whenever a new statutory provision is being enacted (or a new constitutional
provision adopted), the text of the new provision will appear in this style type. Also, the
word NEW will appear in that style type in the introductory clause of each SECTION that adds
a new provision to the Indiana Code or the Indiana Constitution.
 Conflict reconciliation: Text in a statute in this style type or this style type reconciles conflicts
between statutes enacted by the 2024 Regular Session of the General Assembly.

  SENATE ENROLLED ACT No. 422

   AN ACT to amend the Indiana Code concerning utilities.

   Be it enacted by the General Assembly of the State of Indiana:

   SECTION 1. IC 8-1-8.5-3.4 IS ADDED TO THE INDIANA CODE
AS A NEW SECTION TO READ AS FOLLOWS [EFFECTIVE JULY
1, 2025]: Sec. 3.4. (a) As used in this section, "advanced
transmission technologies" means software or hardware
technologies that increase the capacity, efficiency, reliability, or
safety of an existing or new electric transmission facility, including:

      (1) grid enhancing technologies, such as dynamic line rating,
      advanced power flow controllers, and topology optimization;
      (2) advanced conductors; and
      (3) other technologies designed to:

         (A) reduce transmission congestion; or
         (B) increase the capacity, efficiency, reliability, or safety of
         an existing or new electric transmission facility.
   (b) As used in this section, "electric utility" refers to an electric
utility that:
      (1) is listed in 170 IAC 4-7-2(a); and
      (2) owns and operates a transmission or distribution system.
   (c) In any integrated resource plan filed with the commission
under 170 IAC 4-7 after December 31, 2025, an electric utility must
include a description of the potential use of, or investment in, one
(1) or more advanced transmission technologies to enable the
electric utility to safely, reliably, efficiently, and cost effectively

SEA 422
                                    2

meet electric system demand, taking into consideration cost, risk,
uncertainty, and the alternative investments needed to build new
transmission infrastructure if advanced transmission technologies
are not deployed.

   (d) In any integrated resource plan filed with the commission
under 170 IAC 4-7 after December 31, 2029, an electric utility must
include a description of the electric utility's transmission and
distribution systems, as applicable, as specified by the commission
under 170 IAC 4-7.

   SECTION 2. IC 8-1-8.5-14 IS ADDED TO THE INDIANA CODE
AS A NEW SECTION TO READ AS FOLLOWS [EFFECTIVE JULY
1, 2025]: Sec. 14. (a) As used in this section, "advanced
transmission technologies" means software or hardware
technologies that increase the capacity, efficiency, reliability, or
safety of an existing or new electric transmission facility, including:

      (1) grid enhancing technologies, such as dynamic line rating,
      advanced power flow controllers, and topology optimization;
      (2) advanced conductors; and
      (3) other technologies designed to:

         (A) reduce transmission congestion; or
         (B) increase the capacity, efficiency, reliability, or safety of
         an existing or new electric transmission facility.
   (b) As used in this section, "public utility" has the meaning set
forth in section 1 of this chapter.
   (c) The commission shall conduct a study to evaluate the
potential use or deployment of advanced transmission technologies
by public utilities to enable public utilities to:
      (1) safely, reliably, efficiently, and cost effectively meet
      electric system demand; and
      (2) provide safe, reliable, and affordable electric utility service
      to customers.
   (d) In conducting the study, the commission shall evaluate the
following:
      (1) The attributes, functions, costs, and benefits of various
      advanced transmission technologies, including grid enhancing
      technologies and advanced conductors. In evaluating the
      attributes of various advanced transmission technologies
      under this subdivision, the commission shall consider whether
      a particular technology does the following:
         (A) Increases transmission capacity.
         (B) Increases transmission efficiency.
         (C) Reduces transmission congestion.

SEA 422
                                    3

         (D) Reduces the curtailment of generation resources.
         (E) Increases system reliability.
         (F) Increases system resiliency.
         (G) Increases the capacity to connect new energy
         generation resources.
      (2) The potential of each of the advanced transmission
      technologies studied to be used or deployed by public utilities
      to provide safe, reliable, and affordable electric utility service
      to customers in Indiana, considering existing and planned
      transmission infrastructure and projected demand growth.
      (3) Potential reductions in project costs and project
      completion timelines by deploying advanced transmission
      technologies, as compared to traditional transmission
      infrastructure.
      (4) Potential ways to streamline the deployment of advanced
      transmission technologies, including streamlined processes for
      permitting, maintenance, and upgrades.
      (5) Any other aspect of advanced transmission technologies
      that the commission determines will assist policymakers,
      public utilities, ratepayers, and other stakeholders in
      understanding the potential role of advanced transmission
      technologies in the transmission system serving Indiana and
      the region.
   (e) In conducting the study required by this section, the
commission may consult with or invite comments from:
      (1) regional transmission organizations;
      (2) the Federal Energy Regulatory Commission or other
      federal regulators;
      (3) public utilities;
      (4) the office of the utility consumer counselor;
      (5) associations or organizations representing utility
      ratepayers;
      (6) regulatory commissions in other states;
      (7) engineers or other experts; or
      (8) other stakeholders.
The commission may incorporate any information or comments
received under this subsection in its report under subsection (f).
   (f) The commission shall include in the annual report that the
commission is required to submit under IC 8-1-1-14 before
October 1, 2026, a report that includes the commission's findings
with respect to the topics outlined in subsection (d).
   SECTION 3. IC 8-1-39-1.1 IS ADDED TO THE INDIANA CODE

SEA 422
                                    4

AS A NEW SECTION TO READ AS FOLLOWS [EFFECTIVE JULY
1, 2025]: Sec. 1.1. As used in this chapter, "advanced transmission
technologies" means software or hardware technologies that
increase the capacity, efficiency, reliability, or safety of an existing
or new electric transmission facility, including:

      (1) grid enhancing technologies, such as dynamic line rating,
      advanced power flow controllers, and topology optimization;
      (2) advanced conductors; and
      (3) other technologies designed to:

         (A) reduce transmission congestion; or
         (B) increase the capacity, efficiency, reliability, or safety of
         an existing or new electric transmission facility.
   SECTION 4. IC 8-1-39-2, AS AMENDED BY P.L.89-2019,
SECTION 1, IS AMENDED TO READ AS FOLLOWS [EFFECTIVE
JULY 1, 2025]: Sec. 2. (a) As used in this chapter, "eligible
transmission, distribution, and storage system improvements" means
new or replacement electric or gas transmission, distribution, or storage
utility projects that:
      (1) a public utility undertakes for purposes of safety, reliability,
      system modernization, or economic development, including the
      extension of gas service to rural areas;
      (2) were not included in the public utility's rate base in its most
      recent general rate case; and
      (3) either were:
         (A) described in the public utility's TDSIC plan and approved
         by the commission under section 10 of this chapter and
         authorized for TDSIC treatment;
         (B) described in the public utility's update to the public utility's
         TDSIC plan under section 9 of this chapter and authorized for
         TDSIC treatment by the commission; or
         (C) approved as a targeted economic development project
         under section 11 of this chapter.
   (b) The term includes:
      (1) projects that do not include specific locations or an exact
      number of inspections, repairs, or replacements, including
      inspection based projects such as pole or pipe inspection projects,
      and pole or pipe replacement projects; and
      (2) projects involving advanced technology investments to
      support the modernization of a transmission, distribution, or
      storage system, such as advanced metering infrastructure,
      advanced transmission technologies, information technology
      systems, or distributed energy resource management systems.

SEA 422
President of the Senate

President Pro Tempore

Speaker of the House of Representatives

Governor of the State of Indiana

Date:                             Time:

SEA 422
Every fact on this page links to its source, starting with the official bill record.