govt.fyi
Back to SB 1827
Illinois General Assembly· SB 1827Governor Approved

FIRE DISTRICTS--DESIGN-BUILD, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Illinois General Assembly, fetched 2026-09-25. Page and line markers are part of the official record; nothing is edited or removed. This is the current version. The official bill page.
SB1827 Enrolled                     LRB104 10100 JDS 20172 b

1   AN ACT concerning local government.

2   Be it enacted by the People of the State of Illinois,

3 represented in the General Assembly:

4   Section 5. The Counties Code is amended by changing

5 Sections 5-45020 and 5-45025 as follows:

6   (55 ILCS 5/5-45020)

7   Sec. 5-45020. Development of scope and performance

8 criteria.

9   (a) The county shall develop, with the assistance of a

10 licensed design professional or public art designer, a request

11 for proposal, which shall include scope and performance

12 criteria. The scope and performance criteria must be in

13 sufficient detail and contain adequate information to

14 reasonably apprise the qualified design-build entities of the

15 county's overall programmatic needs and goals, including

16 criteria and preliminary design plans, general budget

17 parameters, schedule, and delivery requirements.

18  (b) Each request for proposal shall also include a

19 description of the level of design to be provided in the

20 proposals. This description must include the scope and type of

21 renderings, drawings, and specifications that, at a minimum,

22 will be required by the county to be produced by the

23 design-build entities.
    SB1827 Enrolled      -2-             LRB104 10100 JDS 20172 b

1   (c) The scope and performance criteria shall be prepared

2 by a design professional or public art designer who is an

3 employee of the county, or the county may contract with an

4 independent design professional or public art designer

5 selected under the Local Government Professional Services

6 Selection Act to provide these services.

7   (d) The design professional or public art designer that

8 prepares the scope and performance criteria is prohibited from

9 participating in any design-build entity proposal for the

10 project.

11  (e) The design-build contract may be conditioned upon

12 subsequent refinements in scope and price and may allow the

13 county to make modifications in the project scope without

14 invalidating the design-build contract.

15 (Source: P.A. 102-954, eff. 1-1-23.)

16  (55 ILCS 5/5-45025)

17  Sec. 5-45025. Procedures for Selection.

18  (a) The county must use a two-phase procedure for the

19 selection of the successful design-build entity. Phase I of

20 the procedure will evaluate and shortlist the design-build

21 entities based on qualifications, and Phase II will evaluate

22 the technical and cost proposals.

23  (b) The county shall include in the request for proposal

24 the evaluating factors to be used in Phase I. These factors are

25 in addition to any prequalification requirements of
    SB1827 Enrolled  -3-  LRB104 10100 JDS 20172 b

1 design-build entities that the county has set forth. Each

2 request for proposal shall establish the relative importance

3 assigned to each evaluation factor and subfactor, including

4 any weighting of criteria to be employed by the county. The

5 county must maintain a record of the evaluation scoring to be

6 disclosed in event of a protest regarding the solicitation.

7   The county shall include the following criteria in every

8 Phase I evaluation of design-build entities: (i) experience of

9 personnel; (ii) successful experience with similar project

10 types; (iii) financial capability; (iv) timeliness of past

11 performance; (v) experience with similarly sized projects;

12 (vi) successful reference checks of the firm; (vii) commitment

13 to assign personnel for the duration of the project and

14 qualifications of the entity's consultants; and (viii) ability

15 or past performance in meeting or exhausting good faith

16 efforts to meet the utilization goals for business enterprises

17 established in the Business Enterprise for Minorities, Women,

18 and Persons with Disabilities Act and with Section 2-105 of

19 the Illinois Human Rights Act. The county may include any

20 additional relevant criteria in Phase I that it deems

21 necessary for a proper qualification review.

22  The county may not consider any design-build entity for

23 evaluation or award if the entity has any pecuniary interest

24 in the project or has other relationships or circumstances,

25 including, but not limited to, long-term leasehold, mutual

26 performance, or development contracts with the county, that
    SB1827 Enrolled       -4-  LRB104 10100 JDS 20172 b

1 may give the design-build entity a financial or tangible

2 advantage over other design-build entities in the preparation,

3 evaluation, or performance of the design-build contract or

4 that create the appearance of impropriety. A design-build

5 entity shall not be disqualified under this Section solely due

6 to having previously been awarded a project or projects under

7 any applicable public procurement statute of the State. No

8 proposal shall be considered that does not include an entity's

9 plan to comply with the requirements established in the

10 Business Enterprise for Minorities, Women, and Persons with

11 Disabilities Act, for both the design and construction areas

12 of performance, and with Section 2-105 of the Illinois Human

13 Rights Act. The proposal shall disclose the role of a licensed

14 design professional during the administration of the

15 design-build contract. Nothing in this Section shall prohibit

16 a county from engaging a licensed design professional during

17 the administration of a design-build contract if the county

18 believes that engaging the licensed design professional

19 benefits the project.

20  Upon completion of the qualifications evaluation, the

21 county shall create a shortlist of the most highly qualified

22 design-build entities. The county, in its discretion, is not

23 required to shortlist the maximum number of entities as

24 identified for Phase II evaluation, provided that no less than

25 2 design-build entities nor more than 6 are selected to submit

26 Phase II proposals. If a county receives one response to Phase
    SB1827 Enrolled  -5-  LRB104 10100 JDS 20172 b

1 I, nothing in this Section shall prohibit the county from

2 proceeding with a Phase II evaluation of the single respondent

3 if the county, in its discretion, finds proceeding to be in its

4 best interest.

5   The county shall notify the entities selected for the

6 shortlist in writing. This notification shall commence the

7 period for the preparation of the Phase II technical and cost

8 evaluations. The county must allow sufficient time for the

9 shortlist entities to prepare their Phase II submittals

10 considering the scope and detail requested by the county.

11  (c) The county shall include in the request for proposal

12 the evaluating factors to be used in the technical and cost

13 submission components of Phase II. Each request for proposal

14 shall establish, for both the technical and cost submission

15 components of Phase II, the relative importance assigned to

16 each evaluation factor and subfactor, including any weighting

17 of criteria to be employed by the county. The county must

18 maintain a record of the evaluation scoring to be disclosed in

19 event of a protest regarding the solicitation.

20  The county shall include the following criteria in every

21 Phase II technical evaluation of design-build entities: (i)

22 compliance with objectives of the project; (ii) compliance of

23 proposed services to the request for proposal requirements;

24 (iii) quality of products or materials proposed; (iv) quality

25 of design parameters; (v) design concepts; (vi) innovation in

26 meeting the scope and performance criteria; and (vii)
    SB1827 Enrolled         -6-  LRB104 10100 JDS 20172 b

1 constructability of the proposed project. The county may

2 include any additional relevant technical evaluation factors

3 it deems necessary for proper selection.

4   The county shall include the following criteria in every

5 Phase II cost evaluation: the total project cost, the

6 construction costs, and the time of completion. The county may

7 include any additional relevant technical evaluation factors

8 it deems necessary for proper selection. The total project

9 cost criteria weighting factor shall not exceed 30%.

10  The county shall directly employ or retain a licensed

11 design professional or a public art designer to evaluate the

12 technical and cost submissions to determine if the technical

13 submissions are in accordance with generally accepted industry

14 standards. Upon completion of the technical submissions and

15 cost submissions evaluation, the county may award the

16 design-build contract to the highest overall ranked entity.

17 (Source: P.A. 102-954, eff. 1-1-23; 103-154, eff. 6-30-23.)

18  Section 10. The Illinois Municipal Code is amended by

19 changing Sections 11-39.2-20 and 11-39.2-25 as follows:

20  (65 ILCS 5/11-39.2-20)

21  Sec. 11-39.2-20. Development of scope and performance

22 criteria.

23  (a) The municipality must develop, with the assistance of

24 a licensed design professional or public art designer, a
    SB1827 Enrolled        -7-  LRB104 10100 JDS 20172 b

1 request for proposal, which must include scope and performance

2 criteria. The scope and performance criteria must be in

3 sufficient detail and contain adequate information to

4 reasonably apprise the qualified design-build entities of the

5 municipality's overall programmatic needs and goals, including

6 criteria and preliminary design plans, general budget

7 parameters, schedule, and delivery requirements.

8   (b) Each request for proposal must also include a

9 description of the level of design to be provided in the

10 proposals. This description must include the scope and type of

11 renderings, drawings, and specifications that, at a minimum,

12 will be required by the municipality to be produced by the

13 design-build entities.

14  (c) The scope and performance criteria must be prepared by

15 a design professional or public art designer who is an

16 employee of the municipality, or the municipality may contract

17 with an independent design professional or public art designer

18 selected under the Local Government Professional Services

19 Selection Act to provide these services.

20  (d) The design professional or public art designer that

21 prepares the scope and performance criteria is prohibited from

22 participating in any design-build entity proposal for the

23 project.

24  (e) The design-build contract may be conditioned upon

25 subsequent refinements in scope and price and may allow the

26 municipality to make modifications in the project scope
    SB1827 Enrolled             -8-  LRB104 10100 JDS 20172 b

1 without invalidating the design-build contract.
2 (Source: P.A. 103-491, eff. 1-1-24.)

3   (65 ILCS 5/11-39.2-25)

4   Sec. 11-39.2-25. Procedures for Selection.

5   (a) The municipality must use a two-phase procedure for

6 the selection of the successful design-build entity. Phase I

7 of the procedure will evaluate and shortlist the design-build

8 entities based on qualifications, and Phase II will evaluate

9 the technical and cost proposals.

10  (b) The municipality must include in the request for

11 proposal the evaluating factors to be used in Phase I. These

12 factors are in addition to any prequalification requirements

13 of design-build entities that the municipality has set forth.

14 Each request for proposal must establish the relative

15 importance assigned to each evaluation factor and subfactor,

16 including any weighting of criteria to be employed by the

17 municipality. The municipality must maintain a record of the

18 evaluation scoring to be disclosed in event of a protest

19 regarding the solicitation.

20  The municipality must include the following criteria in

21 every Phase I evaluation of design-build entities: (i)

22 experience of personnel; (ii) successful experience with

23 similar project types; (iii) financial capability; (iv)

24 timeliness of past performance; (v) experience with similarly

25 sized projects; (vi) successful reference checks of the firm;
    SB1827 Enrolled  -9-  LRB104 10100 JDS 20172 b

1 (vii) commitment to assign personnel for the duration of the

2 project and qualifications of the entity's consultants; and

3 (viii) ability or past performance in meeting or exhausting

4 good faith efforts to meet the utilization goals for business

5 enterprises established in the Business Enterprise for

6 Minorities, Women, and Persons with Disabilities Act and with

7 Section 2-105 of the Illinois Human Rights Act. The

8 municipality may include any additional, relevant criteria in

9 Phase I that it deems necessary for a proper qualification

10 review.

11  The municipality may not consider any design-build entity

12 for evaluation or award if the entity has any pecuniary

13 interest in the project or has other relationships or

14 circumstances, such as long-term leasehold, mutual

15 performance, or development contracts with the municipality,

16 that may give the design-build entity a financial or tangible

17 advantage over other design-build entities in the preparation,

18 evaluation, or performance of the design-build contract or

19 that create the appearance of impropriety. A design-build

20 entity shall not be disqualified under this Section solely due

21 to having previously been awarded a project or projects under

22 any applicable public procurement statute of the State. No

23 proposal may be considered that does not include an entity's

24 plan to comply with the requirements established in the

25 Business Enterprise for Minorities, Women, and Persons with

26 Disabilities Act, for both the design and construction areas
    SB1827 Enrolled  - 10 - LRB104 10100 JDS 20172 b

1 of performance, and with Section 2-105 of the Illinois Human

2 Rights Act. The proposal shall disclose the role of a licensed

3 design professional during the administration of the

4 design-build contract. Nothing in this Section shall prohibit

5 a municipality from engaging a licensed design professional

6 during the administration of a design-build contract if the

7 municipality believes that engaging the licensed design

8 professional benefits the project.

9   Upon completion of the qualification evaluation, the

10 municipality must create a shortlist of the most highly

11 qualified design-build entities. The municipality, in its

12 discretion, is not required to shortlist the maximum number of

13 entities as identified for Phase II evaluation if no less than

14 2 design-build entities nor more than 6 are selected to submit

15 Phase II proposals. If a municipality receives one response to

16 Phase I, nothing in this Section shall prohibit the

17 municipality from proceeding with a Phase II evaluation of the

18 single respondent if the municipality, in its discretion,

19 finds proceeding to be in its best interest.

20  The municipality must notify the entities selected for the

21 shortlist in writing. This notification must commence the

22 period for the preparation of the Phase II technical and cost

23 evaluations. The municipality must allow sufficient time for

24 the shortlist entities to prepare their Phase II submittals

25 considering the scope and detail requested by the

26 municipality.
    SB1827 Enrolled  - 11 - LRB104 10100 JDS 20172 b

1   (c) The municipality must include in the request for

2 proposal the evaluating factors to be used in the technical

3 and cost submission components of Phase II. Each request for

4 proposal must establish, for both the technical and cost

5 submission components of Phase II, the relative importance

6 assigned to each evaluation factor and subfactor, including

7 any weighting of criteria to be employed by the municipality.

8 The municipality must maintain a record of the evaluation

9 scoring to be disclosed in event of a protest regarding the

10 solicitation.

11  The municipality must include the following criteria in

12 every Phase II technical evaluation of design-build entities:

13 (i) compliance with objectives of the project; (ii) compliance

14 of proposed services to the request for proposal requirements;

15 (iii) quality of products or materials proposed; (iv) quality

16 of design parameters; (v) design concepts; (vi) innovation in

17 meeting the scope and performance criteria; and (vii)

18 constructability of the proposed project. The municipality may

19 include any additional relevant technical evaluation factors

20 it deems necessary for proper selection.

21  The municipality must include the following criteria in

22 every Phase II cost evaluation: the total project cost, the

23 construction costs, and the time of completion. The

24 municipality may include any additional relevant technical

25 evaluation factors it deems necessary for proper selection.

26 The total project cost criteria weighting factor may not
    SB1827 Enrolled    - 12 - LRB104 10100 JDS 20172 b

1 exceed 30%.

2   The municipality must directly employ or retain a licensed

3 design professional or a public art designer to evaluate the

4 technical and cost submissions to determine if the technical

5 submissions are in accordance with generally accepted industry

6 standards. Upon completion of the technical submissions and

7 cost submissions evaluation, the municipality may award the

8 design-build contract to the highest overall ranked entity.

9 (Source: P.A. 103-491, eff. 1-1-24.)

10  Section 15. The Fire Protection District Act is amended by

11 changing Section 11k as follows:

12  (70 ILCS 705/11k)

13  Sec. 11k. Competitive bidding; notice requirements.

14  (a) The board of trustees shall have the power to acquire

15 by gift, legacy, or purchase any personal property necessary

16 for its corporate purposes provided that all contracts for

17 supplies, materials, or work involving an expenditure in

18 excess of $20,000 shall be let to the lowest responsible

19 bidder after advertising as required under subsection (b) of

20 this Section; except that, if the board of trustees seeks to

21 purchase equipment directly from a dealer or an original

22 manufacturer in excess of $50,000, then the contract for

23 purchase shall be let to the lowest responsible bidder after

24 advertising as required under subsection (b) of this Section.
    SB1827 Enrolled  - 13 - LRB104 10100 JDS 20172 b

1 The board is not required to accept a bid that does not meet

2 the district's established specifications, terms of delivery,

3 quality, and serviceability requirements. Contracts which, by

4 their nature, are not adapted to award by competitive bidding,

5 are not subject to competitive bidding, including, but not

6 limited to:

7   (1) contracts for the services of individuals

8   possessing a high degree of professional skill where the

9   ability or fitness of the individual plays an important

10  part;

11  (2) contracts for the printing of finance committee

12  reports and departmental reports;

13  (3) contracts for the printing or engraving of bonds,

14  tax warrants, and other evidences of indebtedness;

15  (4) contracts for the maintenance or servicing of, or

16  provision of repair parts for, equipment which are made

17  with the manufacturer or authorized service agent of that

18  equipment where the provision of parts, maintenance, or

19  servicing can best be performed by the manufacturer or

20  authorized service agent, or which involve proprietary

21  parts or technology not otherwise available;

22  (5) purchases and contracts for the use, purchase,

23  delivery, movement, or installation of data processing

24  equipment, software, or services and telecommunications

25  and interconnect equipment, software, and services;

26  (6) contracts for duplicating machines and supplies;
    SB1827 Enrolled  - 14 - LRB104 10100 JDS 20172 b

1   (7) contracts for utility services such as water,

2   light, heat, telephone or telegraph;

3   (8) contracts for goods or services procured from

4   another governmental agency;

5   (9) purchases of equipment previously owned by some

6   entity other than the district itself; and

7   (10) contracts for goods or services which are

8   economically procurable from only one source, such as for

9   the purchase of magazines, books, periodicals, pamphlets,

10  reports, and online subscriptions.

11  Contracts for emergency expenditures are also exempt from

12 competitive bidding when the emergency expenditure is approved

13 by a vote of 3/4 of the members of the board.

14  (b) Except as otherwise provided in subsection (a) of this

15 Section, all proposals to award contracts involving amounts in

16 excess of $20,000 shall be published at least 10 days,

17 excluding Sundays and legal holidays, in advance of the date

18 announced for the receiving of bids, in a secular English

19 language newspaper of general circulation throughout the

20 district. In addition, a fire protection district that has a

21 website that the full-time staff of the district maintains

22 shall post notice on its website of all proposals to award

23 contracts in excess of $20,000. Advertisements for bids shall

24 describe the character of the proposed contract or agreement

25 in sufficient detail to enable the bidders thereon to know

26 what their obligations will be, either in the advertisement
    SB1827 Enrolled  - 15 - LRB104 10100 JDS 20172 b

1 itself, or by reference to detailed plans and specifications

2 on file at the time of the publication of the first

3 announcement. Such advertisement shall also state the date,

4 time and place assigned for the opening of bids, and no bids

5 shall be received at any time subsequent to the time indicated

6 in the announcement. All competitive bids for contracts

7 involving an expenditure in excess of $20,000 must be sealed

8 by the bidder and must be opened by a member of the board or an

9 employee of the district at a public bid opening at which the

10 contents of the bids must be announced. Each bidder must

11 receive at least 3 days' notice of the time and place of the

12 bid opening.

13  (c) In addition to contracts entered into under the

14 Governmental Joint Purchasing Act, a board of trustees may

15 enter into contracts for supplies, materials, or work

16 involving an expenditure in excess of $20,000 through

17 participation in a joint governmental or nongovernmental

18 purchasing program that requires as part of its selection

19 procedure a competitive solicitation and procurement process.

20  (d) Subject to the exceptions under subsections (a) and

21 (c), any procurement by a board of trustees involving the

22 acquisition, by direct or beneficial ownership, of

23 improvements to real estate by a fire protection district

24 which results in an expenditure of district funds in excess of

25 $20,000 must be competitively bid in accordance with the

26 procedures of subsection (b).
   SB1827 Enrolled        - 16 - LRB104 10100 JDS 20172 b

1  (e) Nothing in this Section prohibits a fire protection

2 district from entering into design-build contracts. Fire

3 protection districts are authorized to use a design-build

4 contracting method for construction if a competitive process

5 consistent with the purpose of this Section is used in

6 connection with the selection of the design-builder.

7 (Source: P.A. 102-138, eff. 1-1-22; 102-558, eff 8-20-21;

8 103-634, eff. 1-1-25.)

9  Section 99. Effective date. This Act takes effect July 1,

10 2025.
Every fact on this page links to its source, starting with the official bill record.