SB1723 Enrolled                     LRB104 10079 BDA 20151 b

1   AN ACT concerning safety.

2   Be it enacted by the People of the State of Illinois,

3 represented in the General Assembly:

4   Section 1. Findings and intent. The General Assembly finds

5 that:

6   (1) The Underground Injection Control (UIC) program is

7 authorized by the Safe Drinking Water Act (SDWA) to develop

8 requirements and provisions for the injection of fluids into

9 the subsurface for the purposes of storage or disposal. The

10 main goal of the UIC Program is the protection of Underground

11 Sources of Drinking Water (USDWs). USDWs are aquifers or parts

12 of aquifers that supply a public water system or contain a

13 sufficient quantity of groundwater to supply a public water

14 system now or in the future.

15  (2) The General Assembly finds that the Mahomet Aquifer is

16 unique in that it is the sole source of drinking water for

17 central Illinois residents.

18  (3) The General Assembly further finds that, although

19 carbon sequestration undergoes rigorous federal and State

20 permitting, the uniqueness of the Mahomet Aquifer being the

21 sole source of drinking water for central Illinois residents

22 warrants additional protections.

23  (4) The General Assembly further finds that, although

24 additional review of carbon sequestration activity in the
    SB1723 Enrolled   -2-  LRB104 10079 BDA 20151 b

1 Mahomet Aquifer area is warranted because it is a sole source
2 aquifer, carbon sequestration activities are allowed in areas
3 outside of the aquifer, and carbon sequestration technologies
4 are useful and reliable tools in addressing climate change and
5 allowing the State to meet its decarbonization goals.

6   Section 5. The Environmental Protection Act is amended by

7 changing Sections 59 and 59.5 and by adding Section 59.18 as

8 follows:

9   (415 ILCS 5/59)

10  Sec. 59. Definitions. As used in this Title:

11  "Carbon dioxide capture project" mean a project or

12 facility that:

13  (1) uses equipment to capture a significant quantity

14  of carbon dioxide directly from the ambient air or uses a

15  process to separate carbon dioxide from industrial or

16  energy-related sources, other than oil or gas production

17  from a well; and

18  (2) produces a concentrated fluid of carbon dioxide.

19  "Carbon dioxide stream" means carbon dioxide, any

20 incidental associated substances derived from the source

21 materials and process of producing or capturing carbon

22 dioxide, and any substance added to the stream to enable or

23 improve the injection process or the detection of a leak or

24 rupture.
    SB1723 Enrolled         -3-  LRB104 10079 BDA 20151 b

1   "Carbon sequestration activity" means the injection of one

2 or more carbon dioxide streams into underground geologic

3 formations under at least one Class VI well permit for

4 long-term sequestration.

5   "Criteria pollutants" means the 6 pollutants for which the

6 United States Environmental Protection Agency has set National

7 Ambient Air Quality Standards under Section 109 of the Clean

8 Air Act, together with recognized precursors to those

9 pollutants.

10  "Injection" means the placement of materials into the

11 subsurface from a well.

12  "Project labor agreement" means a prehire collective

13 bargaining agreement that covers all terms and conditions of

14 employment on a specific construction project and must include

15 the following:

16  (1) provisions establishing the minimum hourly wage

17  for each class of labor organization employee;

18  (2) provisions establishing the benefits and other

19  compensation for each class of labor organization

20  employee;

21  (3) provisions establishing that no strike or disputes

22  will be engaged in by the labor organization employees;

23  (4) provisions establishing that no lockout or

24  disputes will be engaged in by the general contractor

25  building the project; and

26  (5) provisions for minorities and women, as defined
    SB1723 Enrolled         -4-           LRB104 10079 BDA 20151 b

1   under the Business Enterprise for Minorities, Women, and

2   Persons with Disabilities Act, setting forth goals for

3   apprenticeship hours to be performed by minorities and

4   women and setting forth goals for total hours to be

5   performed by underrepresented minorities and women.

6 "Project labor agreement" includes other terms and conditions

7 a labor organization or general contractor building the

8 project deems necessary.

9   "Sequestration facility" means the carbon dioxide

10 sequestration reservoir, underground equipment, including, but

11 not limited to, well penetrations, and surface facilities and

12 equipment used or proposed to be used in a carbon

13 sequestration activity. "Sequestration facility" includes each

14 injection well and equipment used to connect surface

15 activities to the carbon dioxide sequestration reservoir and

16 underground equipment. "Sequestration facility" does not

17 include pipelines used to transport carbon dioxide to a

18 sequestration facility.

19  "Sole source aquifer" means an aquifer designated as a

20 sole source or principal aquifer by the United States

21 Environmental Protection Agency under the Safe Drinking Water

22 Act, which, for purposes of this definition, consists of the

23 Sole Source Aquifer Area, as designated by the United States

24 Environmental Protection Agency on March 19, 2015.

25 (Source: P.A. 103-651, eff. 7-18-24.)
    SB1723 Enrolled           -5-      LRB104 10079 BDA 20151 b

1   (415 ILCS 5/59.5)

2   Sec. 59.5. Prohibitions.

3   (a) No person shall conduct a carbon sequestration

4 activity without a permit issued by the Agency under Section

5 59.6. This prohibition does not apply to any carbon

6 sequestration activity in existence and permitted by the

7 United States Environmental Protection Agency on or before the

8 effective date of this amendatory Act of the 103rd General

9 Assembly or to any Class VI well for which (1) a Class VI well

10 permit has been filed with the United States Environmental

11 Protection Agency and a completeness determination had been

12 received prior to January 1, 2023, and (2) the sequestration

13 activity will occur on a contiguous property with common

14 ownership where the carbon dioxide is generated, captured, and

15 injected.

16  (b) No person shall conduct a carbon sequestration

17 activity in violation of this Act.

18  (c) No person shall conduct a carbon sequestration

19 activity in violation of any applicable rules adopted by the

20 Pollution Control Board.

21  (d) No person shall conduct a carbon sequestration

22 activity in violation of a permit issued by the Agency under

23 this Act.

24  (e) No person shall fail to submit reports required by

25 this Act or required by a permit issued by the Agency under

26 this Act.
    SB1723 Enrolled             -6-      LRB104 10079 BDA 20151 b

1   (f) No person shall conduct a carbon sequestration

2 activity without obtaining an order for integration of pore

3 space from the Department of Natural Resources, if applicable.

4   (g) No person shall conduct a carbon sequestration

5 activity within a sequestration facility that overlies,

6 underlies, or passes through a sole source aquifer. Nothing in

7 this subsection deprives the Agency of authority to deny a

8 carbon sequestration permit.

9 (Source: P.A. 103-651, eff. 7-18-24.)

10  (415 ILCS 5/59.18 new)

11  Sec. 59.18. Mahomet Aquifer Advisory Study Commission.

12  (a) The Mahomet Aquifer Advisory Study Commission is

13 hereby created to study and review any reports submitted to

14 the Mahomet Aquifer Advisory Study Commission regarding the

15 safety of carbon capture and storage in the Mahomet Aquifer

16 Area and any sole source aquifer project review areas

17 designated by the United States Environmental Protection

18 Agency. The Commission shall consist of the following members:

19  (1) the Director of the Environmental Protection

20  Agency or the Director's designee;

21  (2) the Director of Natural Resources or the

22  Director's designee;

23  (3) the Director of the Illinois Emergency Management

24  Agency and Office of Homeland Security or the Director's

25  designee;
    SB1723 Enrolled  -7-  LRB104 10079 BDA 20151 b

1   (4) the Director of Agriculture or the Director's

2   designee;

3   (5) the Attorney General or the Attorney General's

4   designee;

5   (6) 3 members appointed by the President of the

6   Senate, only one of whom may be a Senator;

7   (7) 3 members appointed by the Speaker of the House of

8   Representatives, only one of whom may be a Representative;

9   (8) 3 members appointed by the Minority Leader of the

10  Senate, only one of whom may be a Senator; and

11  (9) 3 members appointed by the Minority Leader of the

12  House of Representatives, only one of whom may be a

13  Representative.

14  All meetings of the Mahomet Aquifer Advisory Study

15 Commission shall be open to the public and shall be held within

16 the Mahomet Aquifer Area region or within 25 miles of the

17 region. The Mahomet Aquifer Advisory Study Commission shall

18 maintain a website where all reports and studies submitted to

19 or approved by the Mahomet Aquifer Advisory Study Commission

20 shall be posted for public display. The University of Illinois

21 shall provide administrative assistance to the Mahomet Aquifer

22 Advisory Study Commission. No later than 90 days after the

23 effective date of this amendatory Act of the 104th General

24 Assembly, the Commission shall hold its first meeting at the

25 call of the Director of the Environmental Protection Agency,

26 at which meeting the members shall select a chairperson from
    SB1723 Enrolled  -8-            LRB104 10079 BDA 20151 b

1 among themselves. After its first meeting, the Commission

2 shall meet at the call of the chairperson. Members of the

3 Commission shall serve without compensation. Members' terms

4 shall be 3 years, and members may be reappointed by their

5 respective appointing authority.

6   (b) Subject to appropriation, the Prairie Research

7 Institute at the University of Illinois at Urbana-Champaign

8 shall submit a final report on the potential for carbon

9 sequestration in the Mahomet Aquifer Area and any project

10 review areas to the Mahomet Aquifer Advisory Study Commission

11 no later than December 31, 2030. The Prairie Research

12 Institute shall submit annual status reports by December 31,

13 2027 and December 31 of each year thereafter until the final

14 report is submitted on December 31, 2030. The final report

15 shall provide an assessment of the safety and risks of carbon

16 dioxide storage in the Mahomet Aquifer and its project review

17 areas, including, but not limited to, any effects on human,

18 animal, and environmental health. The report shall review

19 carbon sequestration conducted in Illinois and other similarly

20 situated states, particularly how carbon sequestration affects

21 aquifers and other underground water sources. The report shall

22 review the permitting processes and the coordination with

23 applicable federal law or regulatory commissions, including

24 the Class VI injection well permitting process.

25  (c) The Mahomet Aquifer Advisory Study Commission shall

26 also engage with interested stakeholders throughout the State
    SB1723 Enrolled           -9-  LRB104 10079 BDA 20151 b

1 to gain insights into safety perspectives from residents,

2 environmental      justice  organizations,  environmental

3 nongovernmental organizations, representatives of industry,

4 landowners, farm bureaus, manufacturing interests, labor

5 unions, and others.

6   (d) The Mahomet Aquifer Advisory Study Commission shall

7 submit a final report of its findings regarding the Mahomet

8 Aquifer and its project review areas to the Governor and the

9 General Assembly no later than December 31, 2031. The

10 Commission may file status updates with the Governor and the

11 General Assembly as determined by a majority of the members.

12  (e) The Mahomet Aquifer Advisory Study Commission is

13 dissolved and this Section is repealed on January 1, 2032.