govt.fyi
Back to SB 224
Illinois General Assembly· SB 224Governor Approved

EPA-WATER MAIN INSTALLATION, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Illinois General Assembly, fetched 2026-09-25. Page and line markers are part of the official record; nothing is edited or removed. This is the current version. The official bill page.
SB0224 Enrolled                      LRB104 05145 BDA 15174 b

1  AN ACT concerning safety.

2  Be it enacted by the People of the State of Illinois,

3 represented in the General Assembly:

4  Section 5. The Environmental Protection Act is amended by

5 changing Section 15 as follows:

6  (415 ILCS 5/15) (from Ch. 111 1/2, par. 1015)

7  Sec. 15. Plans and specifications; demonstration of

8 capability; record retention.

9  (a) Owners of public water supplies, their authorized

10 representative, or legal custodians, shall submit plans and

11 specifications to the Agency and obtain written approval

12 before construction of any proposed public water supply

13 installations, changes, or additions is started. Plans and

14 specifications shall be complete and of sufficient detail to

15 show all proposed construction, changes, or additions that may

16 affect sanitary quality, mineral quality, or adequacy of the

17 public water supply; and, where necessary, said plans and

18 specifications shall be accompanied by supplemental data as

19 may be required by the Agency to permit a complete review

20 thereof. In the case of water main installation projects, all

21 water main and appurtenances, including, but not limited to,

22 fire hydrants and valves that are under the ownership and

23 control of a public water supply and located in a public right
    SB0224 Enrolled  -2-  LRB104 05145 BDA 15174 b

1 of way or utility access easement, shall be included in the

2 Agency's written approval. Design review and permitting of

3 water main and fire hydrants is the sole responsibility of the

4 Agency and water main and fire hydrants shall be installed in

5 accordance with the written Agency permit. Fire hydrants

6 connected to a plumbing system shall be installed in

7 accordance with the Illinois Plumbing License Law and the

8 rules and ordinances issued thereunder.

9   (b) All new public water supplies established after

10 October 1, 1999 shall demonstrate technical, financial, and

11 managerial capacity as a condition for issuance of a

12 construction or operation permit by the Agency or its

13 designee. The demonstration shall be consistent with the

14 technical, financial, and managerial provisions of the federal

15 Safe Drinking Water Act (P.L. 93-523), as now or hereafter

16 amended. The Agency is authorized to adopt rules in accordance

17 with the Illinois Administrative Procedure Act to implement

18 the purposes of this subsection. Such rules must take into

19 account the need for the facility, facility size,

20 sophistication of treatment of the water supply, and financial

21 requirements needed for operation of the facility.

22  (c) Except as otherwise provided under Board rules, owners

23 and operators of community water systems must maintain all

24 records, reports, and other documents related to the operation

25 of the community water system for a minimum of 10 years.

26 Documents required to be maintained under this subsection (c)
SB0224 Enrolled  -3-  LRB104 05145 BDA 15174 b

1 include, but are not limited to, all billing records and other
2 documents related to the purchase of water from other
3 community water systems. Documents required to be maintained
4 under this subsection (c) must be maintained on the premises
5 of the community water system, or at a convenient location
6 near its premises, and must be made available to the Agency for
7 inspection and copying during normal business hours.
8 (Source: P.A. 96-603, eff. 8-24-09.)
Every fact on this page links to its source, starting with the official bill record.