Shown verbatim: the complete text as captured from the official PDF posted by the Delaware General Assembly, fetched 2026-09-25. Page and line markers are part of the official record; nothing is edited or removed. This is the current version. The official bill page.
SPONSOR: Sen. Poore & Rep. Cooke
Sen. Hoffner
DELAWARE STATE SENATE
153rd GENERAL ASSEMBLY
SENATE BILL NO. 275
AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE UNDERGROUND UTILITY
DAMAGE PREVENTION AND SAFETY ACT.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF DELAWARE:
1 Section 1. Amend Chapter 8, Title 26 of the Delaware Code by making deletions as shown by strike through and
2 insertions as shown by underline as follows and by redesignating accordingly:
3 § 801. Purpose; citation; construction.
4 (a) For the purposes of providing for the protection of the public health and safety, certain procedures are
5 necessary to assure that persons performing excavation or demolition operations know, prior to commencing such
6 operations, of the presence or location of underground utilities in the excavation or demolition area. Certain precautions
7 must be taken to avoid injuries and damage to life, limb limb, and property, to avoid disruption and discontinuation of
8 utility services to members of the public and to promote safe operations during excavation and demolition.
9 (b) This subchapter shall be known and may be cited as the “Underground Utility Damage Prevention and Safety
10 Act.” This chapter shall be liberally construed and applied to promote its underlying purposes and policies. (62 Del. Laws,
11 c. 148, § 2; 69 Del. Laws, c. 455, § 1.)
12 § 802. Definitions.
13 As used in this chapter, unless the context otherwise requires:
14 (1) “Abandoned” means no longer in service or use and physically disconnected from a facility.
15 (1)(2) “Approved notification center” shall mean an organization identified by § 807 of this title and which
16 complies with the requirements of § 807 of this title and is otherwise operated in accordance with the Federal Pipeline
17 Safety Regulations codified at 49 C.F.R. Ch. 1, § 198.39. means the communication system established within this state
18 pursuant to § 807 of this title to:
19 a. Provide a toll-free number, 811 access, or internet access for excavators or designers or any other
20 person covered by this act to contact facility owner / operators and notify them of their intent to perform
21 excavation.
22 b. Maintain an owner/operator/excavator information exchange system.
SD : MD : ALW Page 1 of 20 Released: 04/08/2026 04:10 PM
2711530168
23 (3) “Backfill” means to fill the void created by excavating.
24 (4) “Business Day” means any day except a Saturday, Sunday, or legal holiday prescribed by Title 1, Chapter 5,
25 §501 of Delaware Code, beginning at 12:01am and ending at 11:59pm.
26 (5) “Cathodic Protection” means the process of arresting corrosion on a buried or submerged structure by
27 electrically reversing the natural chemical reaction. This includes installation of a sacrificial anode bed, use of a rectifier-
28 based system, or any combination of these or similar systems. Wiring is installed between the buried or submerged
29 structure and all anodes and rectifiers; wiring is also installed to test stations that are used to measure the effectiveness of
30 the cathodic protection system.
31 (6) “Commission” means the Public Service Commission of Delaware.
32 (7) "Complex project" means a single project, or series of repetitive, small, short-term projects that are related in
33 scope, that impact facilities over a long period of time or a large area.
34 (8) “Compliance” means adherence to the statute and its regulations.
35 (2)(9) “Damage” shall mean means any impact or exposure that may result in the need to repair an underground
36 facility due to a weakening or the partial or complete destruction of the facility, including the protective coating, tracer
37 wire, lateral support, cathodic protection, or the housing for the facility, device, or facility. , but is not limited to:
38 a. The complete or partial destruction, dislocation or weakening of structure or lateral support of a utility
39 line, or
40 b. The complete or partial penetration or destruction on any utility line, appurtenance, protective coating,
41 covering, housing or other protective device, or
42 c. The complete or partial severance of any utility line.
43 (10) “Design Ticket” means a request for facility information as an aid to design a project that may impact utility
44 facilities when initiated. No excavation can be performed under this ticket.
45 (3)(11) “Demolish or demolition” shall mean means any operation by which a structure or mass of material is
46 wrecked, razed, rendered, moved or removed by means of any tools, equipment or discharge of explosives capable of
47 damaging underground or submarine utility lines. facilities.
48 (4)(12) “Designer” shall mean means any architect, engineer or other person, acting either as an employer or
49 employee, who prepares or issues a drawing for a construction or other project which requires excavation or demolition
50 work.
51 (13) “Discrepancy” means a lack of compatibility between the facility marks and the physical environment.
SD : MD : ALW Page 2 of 20 Released: 04/08/2026 04:10 PM
2711530168
52 (5)(14) “DNREC Regulated Site” shall mean means any parcel of land or portion thereof for which a final permit,
53 remediation plan, institutional or administrative control, use restriction or similar limitation is imposed under the authority
54 granted to the Department of Natural Resources and Environmental Control under Title 7 and for which due process
55 opportunities have been provided.
56 (6)(15) “Emergency” shall mean any condition constituting a clear and present danger to life, health or property by
57 reason of escaping gas or petroleum products, exposed or broken wires, other breaks or defects in an operator’s utility line
58 or by reason of any disaster of artificial or natural causes. means a sudden or unforeseen occurrence involving a clear or
59 imminent danger to life, health, or property; the interruption of essential utility services; or the blockage of transportation
60 facilities that requires immediate action.
61 (16) “Emergency Notice” means a communication to the approved notification center to alert the involved
62 underground facility owners or facility operators of the need to excavate as a result of a sudden or unforeseen occurrence,
63 or national emergency, involving a clear and imminent danger to life, health, environment, or property (including the
64 interruption of essential utility services or the blockage of transportation facilities) that requires immediate excavation.
65 (17) “Engineering control” means man-made controls designed to isolate or contain in the ground waste or
66 materials hazardous to human health and the environment. The term includes all of the following:
67 a. Hazardous, municipal, residual and radioactive waste landfills.
68 b. Vaults, repositories, and in-situ stabilization.
69 c. Caps on residual contamination.
70 d. Groundwater pump and treatment systems, leachate collection systems and monitoring and
71 containment systems.
72 (7)(18) “Excavate” or “excavation” shall mean means any operation in which earth, rock or other material in the
73 ground is moved, removed or otherwise displaced or disturbed by means of any tools, equipment or explosives and
74 includes, without limitation, grading, trenching, digging, dredging, ditching, drilling, augering, tunnelling, boring,
75 backfilling, post pounding, driving objects into the ground, installation of form pins, hammering, scraping, cable or pipe
76 plowing or driving, but using non-mechanized or mechanized equipment, demolition, or explosives in the movement of
77 earth, rock, or other material below existing grade. It includes augering, blasting, boring, digging, ditching, dredging,
78 drilling, driving-in, grading, plowing-in, pulling-in, ripping, scraping, trenching, and tunneling. It does not include the
79 surface cultivation of the soil for agricultural purposes, such as tilling, or patch-type paving where the same, including
80 cutback, does not exceed 12 inches in depth measured from the surface of the pavement being patched. Unless visible and
SD : MD : ALW Page 3 of 20 Released: 04/08/2026 04:10 PM
2711530168
81 obvious evidence of the presence of an unmarked facility exists, driving non-metallic stakes by use of hand tools to a depth
82 of 6 inches or less below existing grade does not constitute excavation.
83 (19) “Excavation Ticket” means a document developed by the approved notification center pursuant to an
84 excavator’s request for underground facilities to be marked. A ticket is valid for 12 business days after the day on which the
85 ticket is transmitted by the Approved Notification Center to a member. On the 13th day, the ticket will expire, and an
86 update, remark, or new excavation ticket shall be required.
87 (8)(20) “Excavator” shall mean means any person, including those acting either as an employer or employee,
88 intending to perform or performing excavation or demolition work. proposing to engage in or engaging in excavation or
89 demolition work for that person or for another person.
90 (21) “Facility” means an underground or submerged conductor, pipe, or structure used to provide electric or
91 communications service (including traffic control loops and similar underground or submerged devices); or an underground
92 or submerged pipe used in carrying, providing, or gathering (typically between the wellhead and transmission line) gas, oil
93 or oil product, sewage, water, or other liquid service (including irrigation systems), and appurtenances thereto.
94 (22) “Facility owner” or “facility operator” means the public utility or agency, political subdivision, municipality,
95 authority, independent homeowner’s association, mobile home park, rural electric cooperative, or other person or entity
96 who owns, operates, or controls the operation of an underground facility. The term does not include the following:
97 a. A person serving the person's own property through the person's own facility if the person does not
98 provide service to any other person.
99 b. A person using a facility which the person does not own or operate if the facility serves only that
100 person’s property.
101 (23) “Final design” means the engineering and construction drawings that are provided to a bidder or other person
102 who is asked to initiate construction on the bid date or the date the project is set for construction in the absence of a bid.
103 (24) “Grade” means the surface of the earth (i.e. ground level) upon which a structure is built or prepared.
104 (25) “Locate” means to indicate the existence of a line or facility by establishing a mark through the use of stakes,
105 paint, flagging, whiskers, or some other customary manner that approximately determines the location of that facility.
106 (26) “Locate request” means a communication between an excavator or designer and the approved notification
107 center in which a request for locating underground facilities is processed.
108 (27) “Locator” means a person whose job is to locate facilities.
109 (28) “Meeting Ticket” means a request for any combination of locators, excavators, designers, or facility owners
110 or facility operators, to assemble on the site and discuss the project or proposed work. Such assembly and discussion must
SD : MD : ALW Page 4 of 20 Released: 04/08/2026 04:10 PM
2711530168
111 occur on all complex projects. Excavation may not be performed on a meeting ticket. Excavation tickets may not be
112 submitted for the project until after the Meeting Ticket.
113 (29) “Notice” means the timely communication by the excavator or designer to the approved notification center
114 that alerts the involved underground facility owner or facility operator of the intent to excavate.
115 (9) “Operator” shall mean any person who furnishes or transports materials or services by means of a utility line.
116 (30) “Owner/Operator/Excavator Information Exchange System” means an interactive communication process or
117 processes whereby all facility owners or facility operators that received an excavation notice from the approved notification
118 center respond back to the approved notification center regarding the status or response that the facility owners or facility
119 operators have made to the excavation notice; and whereby the approved notification center may post such notices for use
120 by the excavator making the excavation notice.
121 (10)(31) “Person” shall mean means any individual, firm, joint venture, partnership, corporation, association,
122 municipality, other political subdivision, state or federal governmental unit, department or agency, state cooperative
123 association, joint stock association and shall include any assignee, trustee, receiver or personal representative thereof. or
124 public or private legal entity.
125 (32) “Positive Response” means communication with the excavator prior to excavation to ensure that all contacted
126 facility owners or facility operators have located their underground facilities and have appropriately marked any potential
127 conflicts within the areas of planned excavation.
128 (33) “Private Service” means a buried facility wholly owned and operated, on private property, by an entity or
129 individual that is not in the business of providing a product or service via that buried facility.
130 (34) “Project owner” means any person who or which engages an excavator for any project which requires
131 excavation work.
132 (35) “Public” means the general population or community at large.
133 (36) “Site” means the specific place denoted on the locate request when excavation or demolition work is being or
134 is planned to be performed. A site should be denoted as a clearly defined bounded area, including relevant identifiable
135 points of reference such as a specific address with a specific description as to the portion of the property, including
136 descriptions such as front, back, left side as facing, right side as facing and directions such as North, South, East, West, or
137 variants thereof. Where possible, the points should also reference the size and radius or circumference of the excavation,
138 utility pad or pedestal numbers, utility pole numbers, markers, landmarks and the like, and latitude and longitude.
139 (37) “Staff” means full-time professional employees of, and outside counsel and consultants retained by, the
140 Public Service Commission, who render advice to the Commission. The Staff may participate in any Commission
SD : MD : ALW Page 5 of 20 Released: 04/08/2026 04:10 PM
2711530168
141 proceeding and may advocate particular positions concerning the issues raised in such proceeding and file supporting
142 material and testimony for the Commission’s consideration.
143 (38) “Test Holes” means the exposure of a facility by safe excavation practices to ascertain the precise horizontal
144 and vertical position of underground facilities. Accepted safe excavation practices vary by state and local jurisdiction, but
145 the preferred techniques include hand digging with extreme caution and vacuum excavation.
146 (39) “Ticket” means a numbered document issued by the Approved Notification Center to notify facility owners or
147 facility operators that a person intends to perform excavation or demolition, or a designer has requested information on the
148 location of underground facilities.
149 (40) “Tolerance zone” means the horizontal space within 24 inches of the outside wall or edge of a facility where
150 special care is to be taken, when located by the facility owner or facility operator. No mechanized equipment will be
151 allowed within the tolerance zone, except to remove the pavement or other manmade hard surface if used during the initial
152 penetration only to the depth necessary and if an individual other than the equipment operator visually monitors the
153 excavation activity. Vacuum excavation will be permitted within the tolerance zone.
154 (41) “Trenchless technology” means a family of methods, materials, and equipment capable of being used for the
155 installation of new or replacement, or rehabilitation of existing, underground infrastructure that requires excavation with
156 minimal disruption to surface traffic business and other activities. “Trenchless technology” includes:
157 a. Tunnelling.
158 b. Microtunnelling,
159 c. Horizontal directional drilling or directional boring.
160 d. Pipe ramming.
161 e. Pipe jacking.
162 f. Moling.
163 g. Horizontal auger boring.
164 h. Any other method for the installation of pipelines and cables below ground with minimal excavation.
165 (11)(42) “Underground pipeline facility operator” shall mean means an operator of a buried pipeline facility used
166 in the transportation of gas, such as propane and natural gas, subject to the Natural Gas Pipeline Safety Act of 1968 (49
167 U.S.C. § 1671 et seq.) [repealed by Act July 5, 1994, P.L. 103-272], or used in the transportation of hazardous liquid
168 subject to the Hazardous Liquid Pipeline Safety Act of 1979 (49 U.S.C. § 2001 et seq.) [repealed by Act July 5, 1994, P.L.
169 103-272]; underground pipeline facility operators include, without limitation, natural gas, propane gas, master meter, LP
170 gas and interstate and intrastate gas and liquid distribution facility operators as defined by these acts.
SD : MD : ALW Page 6 of 20 Released: 04/08/2026 04:10 PM
2711530168
171 (12) “Utility line” shall mean any item of personal property which shall be buried or placed below ground or
172 submerged for use in connection with the storage or conveyance of water, sewage, electronic, cable television, telephonic or
173 telegraphic communications, electric energy, oil, petroleum products, gas or other substances, and shall include, but not be
174 limited to, pipes, sewers, conduits, cables, fiber optic conductors, valves, lines, wires, manholes, vaults, attachments and
175 those portions of poles, pylons or other supports below ground or submerged.
176 (13) “Working day” shall mean every day, except Saturday, Sunday and state, federal and recognized operator
177 holidays.
178 (43) “Vacuum Excavation” means a means of soil extraction through vacuum. Water or air jet devices are
179 commonly used for breaking the ground.
180 (44) “White Lining” means the process by which an excavator identifies where proposed excavation will occur by
181 marking extents of the excavation area or by drawing a polygon shape on a GIS map. That shape is delivered electronically
182 by the approved notification center to its member facility operators
183 § 803. Duties of operator. facility owners and facility operators.
184 It shall be the duty of each operator facility owner or facility operator:
185 (1) To participate in the approved notification center.
186 (2) To give written notice to such approved notification center which shall state all of the following:
187 a. The name of the operator; facility owner or facility operator.
188 b. The location of the operator’s facility owner’s or facility operator’s lines; and lines.
189 c. The operator’s facility owner’s or facility operator’s office address (street, number and
190 political subdivision) and the telephone numbers, email addresses, and points of contact to which
191 inquiries may be directed as to the location of such lines facilities.
192 (3) To give like written notice within 5 working business days after any of the matters stated in the last
193 previous notice shall have changed.
194 (4) To provide positive response to requests from an excavator or facility owner or facility operator who
195 identifies the site of excavation or demolition, or proposed excavation or demolition, for information as to the
196 approximate location and type of the facility owner’s or facility operator’s facilities in the area, not more than 3
197 business days after receipt of such requests.
198 (5) To inform excavators or facility owners or facility operators who identify the site of excavation or
199 demolition, or proposed excavation or demolition, not more than 3 business days after receipt of a request
200 therefore, of the following:
SD : MD : ALW Page 7 of 20 Released: 04/08/2026 04:10 PM
2711530168
201 a. If it is determined by a facility owner or facility operator that a proposed excavation or
202 demolition is planned within 5 feet of a facility as measured in the horizontal plane and that the facility
203 may be damaged, the facility owner or facility operator shall notify the person who proposes to excavate
204 or demolish and shall physically mark the horizontal location of the facility within 24 inches of the
205 facility on the ground by means of stakes, paint, or other suitable means. A facility owner or facility
206 operator shall provide a positive response via the Owner/Operator/Excavator Information Exchange
207 System upon receipt from the system of a notice of excavation, even if it has no affected facilities at the
208 site. This response shall be made in a manner consistent with the procedures established by the approved
209 notification system.
210 b. When marking the location of an underground facility, an owner–member shall use the current
211 color codes established by the American Public Works Association (APWA) for marking underground
212 facilities.
213 (4)(6) To respond to requests from an excavator or operator who identifies designers who identify the site
214 of excavation or demolition, or proposed excavation or demolition, for information as to the approximate location
215 and type of the operator’s utility lines in the area, not more than 2 working days after receipt of such requests.
216 facility owner’s or facility operator’s facilities in the area within 15 business days of receipt of a request.
217 Information that may be provided includes, maps, digital files, GIS data, and plans. Physical markings are at the
218 discretion of the facility owner.
219 (5) To inform excavators or operators who identify the site of excavation or demolition, or proposed
220 excavation or demolition, not more than 2 working days after receipt of a request therefor, of the following:
221 a. If it is determined by an operator that a proposed excavation or demolition is planned within 5
222 feet of a utility line as measured in the horizontal plane and that the utility line may be damaged, the
223 operator shall notify the person who proposes to excavate or demolish and shall physically mark the
224 horizontal location of the utility line within 18 inches of the utility line on the ground by means of stakes,
225 paint or other suitable means within 2 working days after the request. The operator shall also notify the
226 person who proposes to excavate or demolish as to the size of the utility line, the type of temporary
227 marking provided and how to identify the markings. In the case of extraordinary circumstances, if the
228 operator cannot mark the location within 2 working days, the operator shall, upon making such
229 determination, notify the person who proposes to excavate or demolish and shall, in addition, notify the
230 person of the date and time when the location will be marked;
SD : MD : ALW Page 8 of 20 Released: 04/08/2026 04:10 PM
2711530168
231 b. The cooperative steps which the operator may take, either at or off the excavation or
232 demolition site, to assist in avoiding damage to its lines;
233 c. Suggestions for procedures that might be followed in avoiding such damage;
234 d. If the operator has no utility line within 5 feet of the proposed excavation or demolition as
235 measured in the horizontal plane and if a proposed excavation or demolition by blasting is not planned in
236 such proximity to the operator’s utility lines that the utility lines may be damaged, the operator shall
237 advise the person who proposes to excavate or demolish that marking is unnecessary and that the person
238 may therefore begin the excavation or demolition;
239 e. In marking the approximate location of utility lines, the operator shall follow the color coding
240 described herein:
241 Electric power distribution and transmission — Safety red
242 Municipal electric systems — Safety red
243 Gas distribution and transmission — High visibility safety yellow
244 Oil and petroleum products distribution and transmission — High visibility safety
245 yellow
246 Dangerous materials, product lines, steam lines — High visibility safety yellow
247 Telephone and telegraph systems — Safety alert orange
248 Police and fire communications — Safety alert orange
249 Cable television — Safety alert orange
250 Water systems — Safety precaution blue
251 Slurry systems — Safety precaution blue
252 Sewer systems — Safety green.
253 (6) To respond to requests from designers who identify the site of excavation or demolition, for
254 information as to the approximate location and type of the operator’s utility lines in the area within 15 working
255 days of receipt of a request therefor.
256 (7) To inform designers who identify the site of excavation or demolition, or proposed excavation or
257 demolition, not more than 15 working days after receipt of a request therefor of the information set forth at
258 paragraph (5) of this section.
259 (8)(7) Upon receipt of a request pursuant to paragraphs (4), (5), or (6) and/or (7) of this section to assign such
260 request an identifying number (which may be the same as the number assigned by the approved notification center in
SD : MD : ALW Page 9 of 20 Released: 04/08/2026 04:10 PM
2711530168
261 accordance with § 807(b)(5) of this title), inform the requestor of such number and maintain a record showing the name,
262 address and telephone number of the requestor, the site to which the request pertains and the identifying number assigned to
263 the request.
264 (8) To, where contained on its continuing property records, identify the location of a known facility’s
265 point of connection to its facilities, where the point of connection is not owned or operated by the facility owner or
266 facility operator; however, such identification shall not impose any liability upon the facility owner or facility
267 operator for the accuracy of the other facility’s identification. The facility owner or facility operator shall locate all
268 underground facilities within the State highway rights of way unless maintained by another facility owner or
269 facility operator that is franchised by the Delaware Department of Transportation.
270 (9) To participate in preconstruction meetings for a complex project, if requested.
271 (10) If a facility owner or facility operator fails to become a member of the approved notification center
272 in violation of this act and a facility or facilities of such nonmember facility owner or facility operator are
273 damaged by an excavator by reason of such excavator’s failure to notify the facility owner or facility operator
274 because the facility owner or facility operator was not a member of the approved notification center, such facility
275 owner or facility operator shall have no right of recovery from the excavator of any costs associated with the
276 damage to its facilities. This provision shall not be in limitation of any other rights of the excavator.
277 (11) To assure that persons employed by it (or by contractors doing business for it) to perform facility
278 location shall be trained in applicable locating industry standards and practices.
279 (12) To follow all applicable laws and regulations for installing, maintaining, locating, and recording
280 facilities. This includes the installation of tracer wire or some other means of detection, and an access point within
281 a protective enclosure in the public right-of-way for any newly installed or fully replaced non-metallic pipes,
282 including gas, water, and wastewater pipes.
283 (9)(13) Except as provided in paragraph (10)(14) of this section, all operators shall provide notification to
284 the Public Service Commission within 15 working days, or as soon as practicable thereafter if notification cannot
285 be provided within 15 days, of any facilities damage caused by excavation which results in damage as defined in §
286 802(2)c. of this title exceeding $3,000. Notification shall not be required for facilities damage to abandoned lines.
287 The Public Service Commission may notify the Attorney General’s office of such damage.
288 (10)(14) All underground pipeline facility operators shall provide notification to the Public Service
289 Commission as soon as practicable of any facilities damage caused by excavation which results in damage as
290 defined in § 802(2) of this title to gas distribution and transmission lines, oil and petroleum products distribution
SD : MD : ALW Page 10 of 20 Released: 04/08/2026 04:10 PM
2711530168
291 and transmission lines, or dangerous materials, product lines or steam lines. (62 Del. Laws, c. 148, § 2; 69 Del.
292 Laws, c. 455, § 1; 70 Del. Laws, c. 186, § 1; 81 Del. Laws, c. 405, § 1.)
293 § 804. Additional duties of facility owners and facility operators who are also underground pipeline facility
294 operators.
295 It shall be the duty of each underground pipeline facility owner or facility operator to:
296 (1) Participate in the approved notification center.
297 (2) Provide as follows for inspection of pipelines that such operator has reason to believe could be
298 damaged by excavation activities:
299 a. The inspection must be done as frequently as necessary during and after the excavation
300 activities to verify the integrity of the pipeline; and
301 b. In case of blasting, any inspection must include leakage surveys. (69 Del. Laws, c. 455, § 1.)
302 § 805. Duties of designers.
303 It shall be the duty of each designer:
304 (1) To contact the approved notification center and obtain the identity of facility owners or facility
305 operators whose facilities are listed, as required by § 803 of this title, in the area of the proposed excavation or
306 demolition; demolition.
307 (2) To obtain the information prescribed in § 803(6) or (7) of this title from each facility owner or
308 operator identified as required by § 803(2) of this title; title.
309 (3) To show upon the drawing the type of each line, facility, derived pursuant to the request made as
310 required in paragraph (2) of this section, the name of the facility owner or facility operator and telephone number
311 of the approved notification center, and instructions to “notify the approved notification center not less than 2
312 working days, 3 business days, but no more than 10 working days,12 business days, prior to the excavation or
313 demolition activities.
314 (4) To meet with each facility owner or facility operator who requests more information on the scope of
315 the project.
316 (5) To make reasonable efforts to prepare the construction drawings to avoid damage and minimize
317 interference with a facility owner’s or facility operator’s facilities in the construction area consistent with existing
318 easements or otherwise consistent with this statute where no easement exists.
319 § 806. Duties of excavators.
320 (a) Prior to undertaking any excavation or demolition activities, it shall be the duty of each excavator to:
SD : MD : ALW Page 11 of 20 Released: 04/08/2026 04:10 PM
2711530168
321 (1) Ascertain the telephone number contact information of the approved notification center;center.
322 (2) Notify the approved notification center not less than 2 working 3 business days, but no more than 10
323 working 12 business days, prior to the day of the commencement of such work of the following:
324 a. The name of the person notifying the approved notification center; center.
325 b. The name, address, email address, and telephone number of the excavator; excavator.
326 c. The specific location, starting date and description of the intended excavation or demolition
327 activity;activity. If exact location cannot be determined, white line marking is highly recommended.
328 d. All tickets shall conform to the following:
329 1. The location of excavation or demolition is limited to a maximum length of 1,320
330 continuous feet.
331 2. If a proposed excavation is of such size or length that the facility owner cannot mark
332 it within 2 days, then an excavator shall notify the owner where excavation will first be made
333 and the remainder shall be marked by the owner within a reasonable time thereafter. 3. On
334 extensive or contiguous construction, an excavator and a facility owner may enter into working
335 agreements regarding the time periods for marking the excavation.
336 4. Individual tickets are required for any lot or parcel that is non-contiguous.
337 (3) Ascertain the location and type of utility lines facilities, and information prescribed by § 803(5) of this
338 title and the identifying number or numbers assigned (pursuant to § 807 of this title) by the approved notification
339 center in response to the notice prescribed in paragraph (a)(2) of this section; section by contacting the
340 Owner/Operator/Excavator Information Exchange System.
341 (4) Inform each person employed by the excavator at the site of such work of the information obtained
342 pursuant to paragraph (a) (3) of this section; section. No excavation may begin until a positive response code of
343 clear or no conflict or marked is received through the positive response system from each facility owner or facility
344 operator through the Owner/Operator/Excavator Information Exchange System.
345 (5) Maintain in a prudent and careful manner all markings provided by facility owners or facility operators in
346 accordance with the provisions of § 803 of this title and, in the event of the obliteration, destruction or removal of the
347 markings, the excavator shall notify the approved notification center of the need for remarking of utility line by the
348 operators; operators. In the event of the obliteration, destruction, or removal of the markings, the excavator shall notify the
349 approved notification center and follow § 806(a)(2) of this title.
SD : MD : ALW Page 12 of 20 Released: 04/08/2026 04:10 PM
2711530168
350 (6) Establish and maintain a mutually agreeable schedule of required utility locating with each involved
351 operator to insure that the purpose of this chapter is met whenever the intended excavation or demolition will
352 occur at multiple locations, on various dates, on a construction site or public works project with a duration in
353 excess of 20 working days. Proper establishment and prudent, careful, compliance with such a schedule, after
354 initial notice as required under paragraph (a)(2) of this section, shall be considered as notice required in paragraph
355 (a)(2) of this section for the balance of the construction project;
356 (6) If visible and obvious evidence of the presence of an unmarked facility exists, the excavator shall
357 attempt to designate the location of the facility prior to excavating through the means of a second request
358 notification through the approved notification center Positive Response Information System. The facility owner or
359 facility operator, or facility owner’s or facility operator’s subsequent agents designated for facility locations, will
360 have a maximum of 2 hours to respond to this request and designate the location of the unmarked facility.
361 (7) Excavate prudently and carefully and to take all reasonable steps necessary to properly protect,
362 support and backfill underground utility lines facilities. This protection shall include but may not be limited to
363 hand digging, within the limits of the planned excavation or demolition, starting 2 feet of either side of the
364 extremities of the underground utility facility line for other than parallel type excavations and at reasonable
365 distances along the line of excavation for parallel type excavations;excavations.
366 (8) Report immediately to the facility owner or facility operator any break in, or leak on, its utility lines
367 facilities, any dent, gouge, groove, or other damage to such lines facilities or to the coating or cathodic protection
368 made or discovered in the course of the excavation or demolition work;work.
369 (9) Alert immediately the occupants of any premise as to any emergency that the excavator may create or
370 discover at or near such premises.
371 (9) Alert immediately the occupants of any premise as to any emergency that the excavator may create or
372 discover at or near such premises. Immediately notify 911 and the facility owner or facility operator if damage to a
373 facility by the excavator results in the escape of any flammable, toxic or corrosive gas or liquid, or other event that
374 endangers life, health, or property. The excavator shall take reasonable measures, based upon the excavator’s
375 knowledge, training, resources, experience, and understanding of the situation to protect the excavator, the
376 excavator’s employees, and those in immediate danger, and the environment, until the facility owner or facility
377 operator or emergency responders have arrived, and shall remain on site to convey pertinent information to
378 responders until directed to leave.
SD : MD : ALW Page 13 of 20 Released: 04/08/2026 04:10 PM
2711530168
379 (10) No excavation may begin until a positive response code of clear or no conflict or marked is received
380 through the positive response system from each facility owner or facility operator through the
381 Owner/Operator/Excavator Information Exchange System. The scheduled notification date shall exclude the date
382 upon which notification was received by the approved notification center and shall exclude notification received
383 on a Saturday, a Sunday, or a holiday, and such notifications shall be processed by the approved notification center
384 as of the first business day following receipt.
385 (11) In the case of complex project, a preconstruction meeting shall take place at any time prior to the
386 commencement of excavation, and the excavator, facility owner or facility operator, designer, or the facility
387 owner’s or facility operator’s agents, shall attend the meeting. Notice of the meeting shall be given sufficiently in
388 advance so as to permit attendance, either in person or otherwise, by the parties above, and shall include
389 information sufficient to identify the scope of the work. Any facility owner or facility operator with facilities at the
390 site may request a meeting with the excavator and such a meeting shall be held between the excavator and the
391 facility owner or facility operator requesting the meeting.
392 (12) To exercise due care; and to take all reasonable steps necessary to avoid injury to or otherwise
393 interfere with all facilities where positions have been provided to the excavator by the facility owners or facility
394 operators pursuant to this act. The excavator shall employ prudent techniques, which may include test holes, to
395 ascertain the precise location of such facilities.
396 (13) An excavator shall assist a facility owner or facility operator in determining the involvement of the
397 facility owner’s or facility operator’s facilities by disclosing additional available information requested by the
398 facility owner or facility operator, including dimensions and the direction of the proposed excavation.
399 (14) If using horizontal directional drilling (HDD), the excavator shall use the best practices published by
400 the current best practices.
401 (15) If, after receiving information from the approved notification center or directly from a facility owner
402 or facility operator, the excavator decides to change the location, scope or duration of a proposed excavation, the
403 excavator shall notify the approved notification center of the change.
404 (16) Excavators are encouraged to use test holes to ascertain the precise location of all facilities within 5
405 feet of the excavation and shall take extra precautions within the tolerance zone, as outlined in § 802 of this title.
406 Excavators shall use test holes to ascertain the precise location of all facilities that contain hazardous or flammable
407 substances within 5 feet of marked facilities such as natural gas or petroleum pipelines. If a test hole is dug and the
SD : MD : ALW Page 14 of 20 Released: 04/08/2026 04:10 PM
2711530168
408 facility is not found, the excavator shall cease excavation and notify the facility owner or facility operator of this
409 fact immediately.
410 (b) The requirements of paragraphs (a)(1) through (5)(6), (10), (11), (13), and (15) of this section shall not apply to
411 an excavator performing excavation or demolition work in any emergency. However, excavators performing excavation or
412 demolition activities in an emergency shall notify the approved notification center at the earliest practicable moment of the
413 information prescribed in paragraph (a)(2) of this section. (69 Del. Laws, c. 455, § 1; 70 Del. Laws, c. 186, § 1.)
414 § 807. Approved notification center.
415 (a) The approved notification center shall be Utilities Service Protection of Delmarva, Inc.
416 (a) Utilities Service Protection Center of Delmarva, Inc. (USPCD) shall provide for the approved notification
417 center.
418 (b) The approved notification center shall:
419 (1) Receive and record information prescribed by § 803 of this title regarding the location of facility
420 owners’ or facility operators’ utility lines facilities within the State; State.
421 (2) Receive and record information prescribed by §§ 805 and § 806 of this title regarding notice by excavators or
422 designers of intended excavation or demolition activity; activity.
423 (3) Promptly transmit to the facility owners or facility operators identified in accordance with § 803 of
424 this title, the information received as prescribed by paragraph (b)(2) of this section; section.
425 (4) Maintain records of each notice received in accordance with paragraph (b)(2) of this section for a
426 period of not less than 6 years; years.
427 (5) Assign an identifying number to the notice prescribed in paragraph (b)(2) of this section;
428 (6) Notify those persons giving notice as prescribed by § 806 of this title, of the names of participating
429 facility owners or facility operators to whom the notice will be transmitted as prescribed by paragraph (b)(3) of
430 this section and approved notification center’s identifying number assigned (pursuant to paragraph (b)(5) of this
431 section) to the notice prescribed in paragraph (b)(2) of this section; section.
432 (7) Provide a toll-free telephone number for use by any person providing notice as prescribed by §§ 803,
433 805 805, and 806 of this title; title.
434 (8) Identify persons who normally engage in excavation activities in this State; State.
435 (9) Notify the persons identified in paragraphs (b)(7) and (8) of this section and the general public as
436 often as necessary to make them aware of:
437 a. The existence of the approved notification center; center.
SD : MD : ALW Page 15 of 20 Released: 04/08/2026 04:10 PM
2711530168
438 b. The purpose and general requirements of this chapter; chapter.
439 c. How to learn the location of utility lines facilities before excavation or demolition activities
440 are begun; and begun.
441 d. The toll-free telephone number provided as required by paragraph (b)(7) of this section.
442 (10) Promptly transmit to the appropriate contact of DNREC the information contained in the notice by
443 excavators or designers of intended excavation or demolition activity as to any DNREC Regulated Site.
444 (11) Determine the maximum geographic area that shall constitute a valid single notification and to
445 determine when multiple notifications shall be required of any person, including the method, type, and number of
446 notifications in a complex project.
447 (12) The duties of the approved notification system are the duties set forth in this section, and the duties
448 assigned to other parties in this act are the duties of those parties and are not imputed to the approved notification
449 center. The approved notification center is not responsible for the accuracy of the information provided to it by a
450 third-party concerning excavation notification, nor is it responsible for what is done with that information when it
451 is provided to facility owners or facility operators. The approved notification center is not liable to any person for
452 damages arising out of its non-negligent actions in furtherance of the duties imposed under this act, and then is
453 liable only if its negligence was the proximate cause of the damages claimed.
454 (13) All requests for information shall be reviewed and provided in accordance with the procedures
455 established by the approved notification center’s board of directors or approved by them. (62 Del. Laws, c. 148, §
456 2; 69 Del. Laws, c. 455, § 1; 72 Del. Laws, c. 323, § 3; 81 Del. Laws, c. 405, § 2.)
457 § 808. Exemptions.
458 (a) No penalties provided for in § 810 of this title shall apply to any excavation or demolition done by the owner of
459 a private residence when such excavation or demolition is made entirely on the land on which the private residence is
460 situated and provided there is no encroachment on any facility owner’s or facility operator’s rights-of-way or easement.
461 However, this exemption shall have no effect on the civil liability of such private residence owner pursuant to § 811 of this
462 title.
463 (b) No penalties provided for in § 810 of this title apply to any surface cultivation of the soil for agricultural
464 purposes such as tilling, plowing, disking, etc. provided that it does not infringe on public rights of way or easements. (69
465 Del. Laws, c. 455, § 1.)
466 § 809. Injunction; mandamus.
SD : MD : ALW Page 16 of 20 Released: 04/08/2026 04:10 PM
2711530168
467 Whenever it appears that any person has engaged in, is engaging in in, or is about to engage in excavation or
468 demolition in a manner contrary to safe practices, thereby posing a threat or potential threat, of injury or damage to life,
469 limb limb, or property, not necessarily limited to utility lines facilities, or has otherwise violated, is about to violate violate,
470 or is violating any provision of this chapter, the Attorney General or any facility owner or facility operator or owner of said
471 utility line an affected facility may institute an action for the purpose of having such excavation or demolition stopped or
472 prevented, either by mandatory or prohibitive injunction, mandamus mandamus, or for other relief including interim
473 equitable relief and punitive damages, in a court of competent jurisdiction in the county in which the excavation or
474 demolition has occurred, is occurring occurring, or is about to occur, or in which the defendant’s or respondent’s principal
475 place of business is located. The procedure for all such proceedings shall be as provided in the rules of procedure in the
476 court where said action is commenced or as established by the usual practice and procedure in said court. The court may
477 join as parties any and all persons necessary to make its judgment or processes effective. (62 Del. Laws, c. 148, § 2; 69 Del.
478 Laws, c. 455, § 1.)
479 § 810. Penalties.
480 It is unlawful and a misdemeanor for any person to do any act forbidden, or fail to perform an act required by this
481 chapter.
482 (1) Except as provided in paragraph (2) of this section, whoever, by action or inaction, violates a
483 provision of this chapter shall may, for the first offense, be fined assessed a civil penalty not less than $100 nor
484 more than $500 $1000. For each subsequent like offense, such person shall may be fined assessed a civil penalty
485 not less than $200 nor more than $1,000 $5,000 for each violation.
486 (2) Operators of underground pipeline facilities, excavators, and the approved notification center shall,
487 upon violation of any applicable requirements of 49 C.F.R. part 198, Subpart C [49 C.F.R. § 198.31 et seq.], be
488 subject to civil penalties not to exceed $10,000 for each violation for each day that the violation persists, except
489 that the maximum civil penalty shall not exceed $500,000 for any related series of violations. In determining the
490 amount of the fine, the court shall consider the nature, circumstances and gravity of the violation and, with respect
491 to the person found to have committed the violation, the degree of culpability, any history of prior violations, the
492 effect on ability to continue to do business, any good faith in attempting to achieve compliance, ability to pay the
493 fine and such other matters as justice may require.
494 (3) The Attorney General and the Public Service Commission shall review each notification of failure to
495 perform an act required by this chapter or damage to facilities to determine any violations by operators, excavators
496 or the notification center. Pursuant to that review, the Attorney General or the Public Service Commission may
SD : MD : ALW Page 17 of 20 Released: 04/08/2026 04:10 PM
2711530168
497 impose penalties appropriate to the circumstances and gravity of the violation according to the guidelines in
498 paragraphs (1) and (2) of this section above.
499 (4) Any civil penalty imposed pursuant to this subchapter shall not prevent any party from obtaining civil
500 damages for personal injury or property damage in private actions.
501 (2) Facility owners and facility operators, excavators with a business license, and the approved
502 notification center shall, upon violation of this Act, be subject to the following maximum civil penalties:
503 a. $1,000,000 for violations that result in a death.
504 b. $500,000 for violations causing damage to a structure.
505 c. $100,000 for all other violations.
506 In determining the amount of the civil penalty, consideration shall be given to the nature, circumstances
507 and gravity of the violation, degree of culpability, history of prior violations, effect on ability to continue to do
508 business, any good faith in attempting to achieve compliance, and other relevant factors.
509 (3) Any civil penalty imposed pursuant to this Act does not prevent any party from obtaining civil
510 damages for personal injury or property damage in private actions.
511 (4) In all violations, except those resulting in death or damage to a structure, the Commission may
512 determine that training provided by the approved notification center may be substituted in lieu of a civil penalty.
513 For all violations resulting in civil penalties, training provided by the approved notification center shall also be
514 required.
515 (5) All civil penalties collected shall be used by the approved notification center for one or more of the
516 following purposes:
517 a. Public awareness programs.
518 b. Training and education programs for members and violators of this Act.
519 c. Improvements to the approved notification center operations.
520 d. Reduce the cost to members of the approved notification center.
521 (6) Any cost associated with a civil penalty to a facility owner or facility operator may not be collected by
522 that facility owner or facility operator through rates to its customers.
523 (7) For violations that result in death or damage to a structure, the Attorney General may take
524 enforcement authority pursuant to this Act. For all other violations involving civil penalties and violations where
525 the Attorney General provides an affirmative waiver of enforcement authority, the Commission shall be the
526 enforcement authority pursuant to this Act. The Commission has the authority to determine if any actions shall be
SD : MD : ALW Page 18 of 20 Released: 04/08/2026 04:10 PM
2711530168
527 taken as a result of violations of this Act, except in the event of death or damage to a structure, and to determine if
528 training and education can be substituted in lieu of civil penalties. (62 Del. Laws, c. 148, § 2; 69 Del. Laws, c. 455,
529 § 1; 81 Del. Laws, c. 405, § 3.)
530 § 811. Civil liability.
531 (a) Obtaining information as required by this chapter does not excuse any person making any excavation or
532 demolition from doing so in a careful and prudent manner, nor shall it excuse any person from liability for any damage or
533 injury resulting from the excavation or demolition.
534 (b) If the information required to be provided by facility owners or facility operators pursuant to § 803 of this title
535 is not provided in accordance with the terms thereof, any person damaging or injuring underground facilities of such facility
536 owner or facility operator shall not be liable for such damage or injury except on proof of negligence.
537 (c) Failure by DNREC to notify or otherwise contact an excavator or designer prior to a properly noticed
538 excavation or demolition at any DNREC Regulated Site shall not relieve such excavator or designer from complying with
539 all applicable federal, state, county county, or municipal laws or regulations, nor shall it create any liability in DNREC for
540 any damage or injury resulting from any such excavation or demolition. (62 Del. Laws, c. 148, § 2; 69 Del. Laws, c. 455, §
541 1; 72 Del. Laws, c. 323, § 4.)
542 § 813. Effective date. The effective date of this chapter shall be January 1, 1995.
SYNOPSIS
This Act updates and clarifies the Underground Utility Damage Prevention and Safety Act (UUDPSA), which
dates from the mid-1990s.
Specifically, the Act clarifies the obligations of facility owners and facility operators, which the Act defines as the
person or entity that owns, operates, or controls an underground or submerged conductor, pipe, or structure used to provide
electric or communications service, or an underground or submerged pipe used to carry, provide, or gather gas, oil, sewage,
water, or other liquid service. Under the Act, in addition to their existing obligations under the UUDPSA, facility owners
and facility operators must respond to requests from an excavator concerning the location of their facilities within 3
business days after receipt of the request, and must provide information to the excavator via the Owner/Operator/Excavator
Information Exchange System, which is an interactive system that facilitates communication for that purpose.
In addition, "designers," meaning an architect, engineer, or other person who prepares or issues a drawing for a
construction or other project requiring excavation or demolition work, are required to meet with a facility owner or facility
operator who requests more information on the scope of a project and to make reasonable efforts to prepare construction
drawings in a way that avoids damage and minimizes interference with facilities in the construction area.
"Excavators," meaning any person proposing to engage in excavation or demolition work, must ascertain the
location and type of facilities by contacting the Owner/Operator/Excavator Information Exchange System, and may not
begin excavation until a positive response code of "clear" or "no conflict" or "marked" is received from each facility owner
or facility operator through the Owner/Operator/Excavator Information System. In the event of an emergency that the
excavator discovers or creates, the excavator must immediately notify the occupants of the premises, and, in the event of
damage to a facility by the excavator resulting in the escape of a flammable, toxic, or corrosive gas or liquid, or other event
that poses a danger to life, health or property, the excavator must immediately notify 911 and the facility owner or facility
operator. The excavator is required to exercise due care and take all reasonable steps to avoid injury or interference with
facilities, and, in the case of a complex project, to meet with the facility owner or facility operator or their agents before
construction begins.
SD : MD : ALW Page 19 of 20 Released: 04/08/2026 04:10 PM
2711530168
The Utilities Service Protection Center of Delmarva, Inc. is required to provide for the approved notification
center that, among other things, receives and records information regarding the location of facility owners' and facility
operators' facilities within the State and notice by excavators and designers of intended excavation and demolition activity
and notifies facility owners and facility operators of the information received from excavators and designers.
A facility owner's or facility operator's failure to perform an act required under the UUDPSA is subject to a civil
penalty of up to $1 million, for violations that result in a death; up to $500,000 for violations causing damage to a structure,
and up to $100,000 for all other violations. For all violations other than those resulting in death or damage to a structure,
the Public Service Commission of Delaware may determine that training provided by the approved notification center may
be substituted in lieu of a civil penalty. The imposition of a civil penalty does not prevent any party from obtaining civil
damages for personal injury or property damage in a private action. Civil penalties will be used by the approved notification
center for public awareness programs, training and education programs for members and violators of the UUDPSA,
improvements to the approved notification center, or to reduce the cost to members of the approved notification center.
This Act also makes technical corrections to conform existing law to the standards of the Delaware Legislative
Drafting Manual.
Author: Senator Poore
SD : MD : ALW Page 20 of 20 Released: 04/08/2026 04:10 PM
2711530168Every fact on this page links to its source, starting with the official bill record.