govt.fyi
Back to HB 2004
Arkansas General Assembly· HB 2004Died in House Committee at Sine Die adjournment.

An act TO AMEND THE LAW CONCERNING THE OPERATION AND 10 MAINTENANCE OF RAILROADS, the official text

Shown verbatim: the complete text as captured from the official PDF posted by the Arkansas General Assembly, fetched 2026-07-23. Page and line markers are part of the official record; nothing is edited or removed. The official bill page.
Stricken language would be deleted from and underlined language would be added to present law.

1 State of Arkansas                   A Bill
2 95th General Assembly

3 Regular Session, 2025                                                 HOUSE BILL 2004

4

5 By: Representative D. Whitaker

6

7

8                                 For An Act To Be Entitled

9   AN ACT TO AMEND THE LAW CONCERNING THE OPERATION AND

10  MAINTENANCE OF RAILROADS; TO CREATE STANDARD

11  REQUIREMENTS CONCERNING RAILROAD TRAIN DEFECT

12  DETECTORS AND TRENDING DEFECT DETECTOR TECHNOLOGY; TO

13  REQUIRE CERTAIN INFORMATION TO BE PUBLISHED REGARDING

14  DEFECT DETECTORS AND TRENDING DEFECT DETECTOR

15  TECHNOLOGY; TO CREATE A PROCEDURE FOR THE DETECTION

16  OF A DISCREPANCY IN THE NUMBER OF AXLES ON A RAILROAD

17  TRAIN BY A DEFECT DETECTOR; TO CREATE CIVIL

18  PENALTIES; AND FOR OTHER PURPOSES.

19

20

21                                    Subtitle

22                       TO CREATE STANDARD REQUIREMENTS

23                       CONCERNING RAILROAD TRAIN DEFECT

24                       DETECTORS AND TRENDING DEFECT DETECTOR

25                       TECHNOLOGY.

26

27 BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF ARKANSAS:

28

29  SECTION 1. Arkansas Code Title 23, Chapter 12, is amended to add an

30 additional subchapter to read as follows:

31                       Subchapter 11 -- Train Defect Detector Safety

32

33  23-12-1101. Legislative findings and intent.

34  (a) The General Assembly finds that in light of the February 2023

35 railroad train derailment in East Palestine, Ohio, and in light of the

36 absence of any federal regulation of train defect detectors, the continuing

    *ZRC133*                                                 04/09/2025 9:44:10 PM ZRC133
                                                                            HB2004

1 operation of railroad corporations with no oversight or regulation of hot box

2 detectors operating within the state on a main railroad line or branch

3 railroad line exposes the public to unnecessary dangers and disruptions of

4 commerce.

5          (b) The General assembly intends for this act to eliminate unnecessary

6 dangers and disruptions of commerce imposed on communities and residents of

7 Arkansas.

8

9          23-12-1102. Definitions.

10         As used in this subchapter:

11             (1)(A) "Defect detector" means an integrated or standalone

12 electronic device that scans passing railroad trains or equipment for a

13 defect, including without limitation:

14                  (i) A hot wheel bearing;

15                  (ii) A hot wheel;

16                  (iii) A shipment that has an excessive height or

17 width;

18                  (iv) Shifted lading; and

19                  (v) Dragging equipment.

20                  (B) "Defect detector" includes without limitation:

21                  (i) An acoustic bearing detector;

22                  (ii) A dragging equipment detector; and

23                  (iii) A wheel impact detector;

24             (2)(A) "Railroad" means non-highway ground transportation that

25 runs on rails or electromagnetic guideways in this state.

26                  (B) "Railroad" includes without limitation a:

27                  (i) Commuter railroad service or other short-haul

28 railroad passenger service in a metropolitan or suburban area; and

29                  (ii) High-speed ground transportation system that

30 connects metropolitan areas without regard to whether the high-speed ground

31 transportation system uses new technologies not associated with traditional

32 railroads.

33                  (C) "Railroad" does not include a rapid transit operation

34 in an urban area that is not connected to the general railroad system of

35 transportation;

36             (3) "Railroad corporation" means a corporation, company, or

                                          2   04/09/2025 9:44:10 PM ZRC133
                                                                          HB2004

1 individual that owns or operates a railroad in this state as an owner,

2 lessee, mortgagee, trustee, assignee, or receiver;

3               (4)(A) "Railroad train" means a locomotive, multiple locomotives

4 coupled together, or one (1) or more locomotives coupled with one (1) or more

5 cars that require an air brake test under 49 C.F.R. Part 232, as it existed

6 on January 1, 2025, or 49 C.F.R. Part 238, as it existed on January 1, 2025.

7               (B) "Railroad train" does not include:

8               (i) A locomotive or car during switching operations;

9 or

10              (ii) A locomotive or car is that operated to

11 classify and assemble cars within a railroad yard for the purpose of making

12 or breaking up railroad trains;

13              (5) "Restricted speed" means a speed that:

14              (A) Permits a railroad train to stop within one-half (1/2)

15 of the range of vision; and

16              (B) Does not exceed twenty miles per hour (20 m.p.h.); and

17              (6)(A) "Trending defect detector technology" means an algorithm-

18 based technology applied to a defect detector that allows for communication

19 from one (1) defect detector to another defect detector in order to predict

20 or detect a defect of a railroad train.

21              (B) "Trending defect detector technology" includes without

22 limitation the communication between defect detectors of information

23 concerning:

24              (i) The changing temperature of wheel bearings on a

25 railroad;

26              (ii) Acoustic information; and

27              (iii) Other data that would lead to the discovery of

28 a failure of rolling equipment.

29

30    23-12-1103. Defect detector -- Minimum requirements.

31    (a) A defect detector shall be equipped with:

32              (1) A hot box detector;

33              (2) A hot wheel detector; and

34              (3) Dragging equipment detector technology.

35    (b)(1) A defect detector shall be equipped with an audible alarm that

36 broadcasts on a radio channel frequency assigned to the specific territory in

                                         3            04/09/2025 9:44:10 PM ZRC133
                                                                          HB2004

1 which the defect detector is located by the Association of American

2 Railroads.

3             (2) If a defect is detected, a defect detector shall be equipped

4 to:

5             (A) Sound an alarm over the assigned radio channel

6 frequency three (3) consecutive times for no longer than five (5) seconds and

7 with five (5) seconds of silence in between each sounding of the alarm; and

8             (B) Repeat an audible message three (3) times with twenty

9 (20) seconds of silence between each broadcast of the audible message stating

10 the following information:

11                          (i) The defect detector location milepost and name;

12                          (ii) The track number if the defect detector is

13 located in multiple track territory;

14                          (iii) The total number of axles in the railroad

15 train, including motive power; and

16                          (iv) The location of defects within the railroad

17 train or equipment.

18            (3) If a defect is not detected, the defect detector shall be

19 equipped to provide an audible message that states the following:

20            (A) The location of the defect detector milepost and name;

21            (B) The track number in multiple track territory;

22            (C) The total number of axles in the railroad train,

23 including motive power;

24            (D) The speed of the railroad train; and

25            (E) A statement that no defect was detected, including the

26 phrase, "repeat no defects, out".

27

28     23-12-1104. Trending defect detector technology.

29     (a) A defect detector equipped with trending defect detector

30 technology or similar technology shall:

31            (1) Not have a silent alarm; and

32            (2) Be listed to all operating crew who operate equipment on the

33 railroad track on which the defect detector is located.

34     (b) If a railroad train passes a defect detector equipped with

35 trending defect detector technology and a trending defect issue is detected:

36            (1) The operating crew of the railroad train shall stop in

                                         4      04/09/2025 9:44:10 PM ZRC133
                                                                            HB2004

1 accordance with safe railroad train handling procedures issued by the

2 railroad corporation that owns or operates the railroad train;

3              (2) An inspection of the railroad train shall be made by the

4 operating crew from a position on the ground;

5              (3) The railroad train inspection results shall be noted by the

6 operating crew and presented to the appropriate officer of the railroad

7 corporation, the dispatcher, or another qualified person; and

8              (4) If the inspection under subdivision (b)(2) of this section

9 finds that the railroad train is safe to move, the railroad train may proceed

10 at a speed that does not exceed:

11             (A) Ten miles per hour (10 m.p.h.) if the railroad train

12 is carrying hazardous materials; or

13             (B) Thirty miles per hour (30 m.p.h.) if the railroad

14 train is not carrying hazardous materials.

15      (c) If a railroad train that has a trending defect issue detected

16 under subsection (b) of this section passes another defect detector equipped

17 with trending defect detector technology and a trending defect issue is

18 detected a second time:

19             (1) The operating crew of the railroad train shall stop in

20 accordance with safe railroad train handling procedures issued by the

21 railroad corporation that owns or operates the railroad train;

22             (2) The railroad train or equipment shall be inspected by the

23 operating crew from a position on the ground;

24             (3) A determination shall be made by a qualified person whether

25 the railroad train is safe to move based on the inspection required under

26 subdivision (c)(2) of this section;

27             (4) After the inspection required under subdivision (c)(2) of

28 this section, the railroad train or equipment shall be set out immediately by

29 the operating crew at the nearest siding, spur, or designated repair track;

30 and

31             (5) The railroad train or equipment shall not be moved unless a

32 qualified person has thoroughly inspected and repaired the railroad train or

33 equipment.

34

35      23-12-1105. Defect detector -- Requirements.

36      (a) An installed defect detector shall remain on with all audible

                                        5             04/09/2025 9:44:10 PM ZRC133
                                                                          HB2004

1 alarms set to a volume high enough for an operating crew to hear reporting

2 from the defect detector.

3   (b) A defect detector that is equipped with a hot wheel bearing

4 detector shall have a sensitivity level no higher than one hundred ten

5 degrees Fahrenheit (110�F).

6   (c)(1) If the repair of a defect detector is required, the railroad

7 corporation that owns the defect detector shall notify the Arkansas

8 Department of Transportation.

9   (2) A railroad train operating on a railroad around a defect

10 detector that requires repair:

11                  (A) Shall not exceed the restricted speed; and

12                  (B) May resume timetable speed if the next defect detector

13 on the railroad indicates that the railroad train has no defects.

14

15  23-12-1106. Information required to be published.

16  A railroad corporation shall publish and make known to all operating

17 crews that operate railroad trains over railroad tracks equipped with defect

18 detectors that:

19  (1) An operating crew of a railroad train that receives an alarm

20 from a defect detector or a defect detector equipped with trending defect

21 detector technology shall reduce the speed of the railroad train in

22 accordance with the railroad corporation's operating rules until the defect

23 detector is cleared;

24  (2) After receiving a defect detector message indicating a

25 defect, the operating crew of the railroad train shall stop in accordance

26 with the railroad corporation's operating rules and inspect the railroad

27 train from a position on the ground;

28  (3) An operating crew of a railroad train receiving a defect

29 message of dragging equipment or a similar message from a defect detector

30 shall stop immediately in accordance with the railroad corporation's

31 operating rules and inspect the railroad train from a position on the ground;

32  (4) If defects are found, the railroad train shall be inspected

33 by the operating crew based on the industry standard of twenty (20) axles

34 before and after the reported defect on both sides of the railroad train;

35  (5) An inspection of a railroad train that is required based on

36 a report from a defect detector shall not be made from a vehicle or any other

                                         6  04/09/2025 9:44:10 PM ZRC133
                                                                         HB2004

1 form of transportation; and

2            (6) A person shall not relieve a railroad train operating crew

3 or an operator of a railroad train or equipment from an inspection under this

4 section while operating the railroad train or equipment within the state.

5

6   23-12-1107. Discrepancy in number of axles detected by defect

7 detector.

8   (a) If a defect detector detects that a railroad train has at least

9 two (2) fewer axles than the number of axles known to be in the railroad

10 train, the discrepancy shall be reported to the proper railroad authority

11 governing railroad train movement in the territory.

12  (b) If an axle count provided by a defect detector is at least two (2)

13 or more axles than the number of axles known to be in the railroad train:

14           (1) The proper railroad authority governing railroad train

15 movement in the territory shall be notified;

16           (2) The extra equipment or extra railroad train car shall be

17 identified within five (5) miles of the location where the defect detector

18 reported the defect;

19           (3) If communication is not established with the proper railroad

20 authority, all movement of the railroad train shall stop within five (5)

21 miles of the location where the defect detector reported the defect;

22           (4) The railroad train shall not proceed unless the extra

23 equipment or extra railroad train has been identified;

24           (5) If the extra equipment is known to be hazardous, the

25 railroad train shall not proceed without a radio waybill or proper

26 documentation; and

27           (6) Operating crew at the operating controls of a moving

28 railroad train or equipment shall not be permitted to copy or repeat radio

29 waybill information.

30

31  23-12-1108. Civil penalty.

32  (a)(1) A person or railroad corporation who violates this subchapter

33 is subject to a civil penalty of at least ten thousand dollars ($10,000) but

34 not more than twenty-five thousand dollars ($25,000) for each day that the

35 violation continues.

36           (2) A person or railroad corporation that violates this

                                7                          04/09/2025 9:44:10 PM ZRC133
                                                                          HB2004

1 subchapter is subject to a one-time civil penalty of five hundred thousand

2 dollars ($500,000) if the Director of the State Highways and Transportation

3 finds:

4                 (A) The violation to be grossly negligent; or

5                 (B) That a pattern of repeated violations has caused:

6                 (i) An imminent hazard of death or injury to an

7 individual; or

8                 (ii) Death or injury to an individual.

9         (b) A civil penalty collected under this section shall be deposited

10 into the State Highway and Transportation Department Fund to be used for the

11 maintenance, repair, and construction of the state highway system.

12        (c) If a violation of this subchapter results in a railroad train

13 derailment in the vicinity of a municipality and a civil penalty is assessed

14 under subdivision (a)(2) of this section, one-half (1/2) of the civil penalty

15 shall be remitted to the Arkansas Department of Transportation and one-half

16 (1/2) of the civil penalty shall be remitted to the affected municipality.

17        (d) The director shall determine the amount of a civil penalty imposed

18 under subsection (a) of this section based on:

19             (1) The nature, circumstances, extent, and gravity of the

20 violation;

21             (2) With respect to the violator, the:

22                (A) Degree of the violator's culpability;

23                (B) Violator's history of violations;

24                (C) Violator's ability to pay; and

25                (D) Effect on the violator's ability to continue to do

26 business; and

27             (3) Any other factors required by law.

28

29        SECTION 2. DO NOT CODIFY. Compliance.

30        A railroad corporation operating within this state has twelve (12)

31 months from the effective date of this act to retune all defect detectors

32 within the state to ensure compliance with this act.

33

34

35

36

                  8                                      04/09/2025 9:44:10 PM ZRC133
Every fact on this page links to its source, starting with the official bill record.